Browse
Search
Agenda - 04-06-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 04-06-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 4:06:28 PM
Creation date
9/29/2016 9:16:52 AM
Metadata
Fields
Template:
BOCC
Date
4/6/1987
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
066 3 <br /> In general, the Georgeville and Herndon soils are considered to be <br /> provisionally suitable according to the rules and regulations promulgated by <br /> the Division of Health Service. The Lignum-like soils encountered on the site <br /> are considered to be unsuitable for design and development of subsurface <br /> systems and only provisionally suitable for design and development of spray <br /> irrigation or surface application systems. The limitations of the Georgeville <br /> and Herndon-like soils can be overcome through conservative hydraulic loadings. <br /> The application between .2 and .25 gallons/ft2/day with pressure distribution <br /> or .3 gallons/ft2/day with conventional distribution is an acceptable <br /> hydraulic loading. The application rate onto the Lignum-like soil is <br /> determined through a water balance calculation. The water balance calculation <br /> is attached and will be discussed in the following section on recommendations. <br /> The water balance calculation does indicate, however, that approximately 20 <br /> inches of water can be applied over the site. <br /> Soils are a limitation to optimum development of this property. Lot sizes <br /> must be quite large to accommodate the development potential of this property. <br /> The installation of both subsurface wastewater treatment systems and surface <br /> treatment systems are necessary to allow for optimum development of this <br /> property. The design limitations can be overcome through careful placement, <br /> careful design, and careful operation of the selected wastewater treatment <br /> options. <br /> Recommendations <br /> There are two distinct options which are available for handling the <br /> wastewater generated at the Wolfe site. One is to utilize a slow rate spray <br /> irrigation system to handle a portion of the waste flow and a community <br /> subsurface wastewater treatment and disposal system to handle the wastewater <br /> from the remaining homes. Based on the soil analysis and hand auger borings <br />
The URL can be used to link to this page
Your browser does not support the video tag.