Orange County NC Website
042 <br /> imposed by the Town of Hillsborough. The cost of <br /> constructing any connection to the sewer line and the actual <br /> cost of making the connection to the sewer line shall be born <br /> by Liner. <br /> 2. The portion of the easement described as <br /> Easement No. 2 (described as such in the Easement) is for the <br /> location and operation of a pump station, which pump station <br /> is identified in the project as the "McGowan Creek pump <br /> station." The future plan for the overall Efland Area Sewer <br /> System calls for the extension of the intercepter, which now <br /> terminates at Efland/Cedar Grove Road and at the McGowan <br /> Creek pump station, to Brook Hollow Road. When the extension <br /> of the intercepter (from Efland/Cedar Grove Road to Brook <br /> Hollow Road) is connected to the existing intercepter (at the <br /> existing McGowan Creek pump station) allowing wastewater to <br /> flow from the existing intercepter to the extension of the <br /> intercepter, the McGowan Creek pump station will be relocated <br /> from the property of Liner described in the Easement. At the <br /> time the pump station is relocated from this property of <br /> Liner, County agrees to convey to Liner that portion of the <br /> easement described as easement No. 2 (described as such in <br /> the Easement) at no cost to Liner. <br /> 3. At the time the pump station is relocated from <br /> the property of Liner, as described above, Liner agrees to <br /> convey to County a 20-foot wide easement, with a forty-feet <br /> wide construction easement, in the form of the Easement, to <br /> 2 <br />