Browse
Search
2016-544-E Emergency Svc - Eaton Corporation - UPS Services Contract
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-544-E Emergency Svc - Eaton Corporation - UPS Services Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2016 11:21:11 AM
Creation date
9/29/2016 8:04:36 AM
Metadata
Fields
Template:
BOCC
Date
9/28/2016
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Manager signed
Amount
$6,345.00
Document Relationships
2017-568-E ES - Eaton Corporation -Service Agreement Addendum to 2016-544-E
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-544-E ES - Eaton Corporation - UPS Services Contract
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:90E3EAFE-4412-496F-B485-61 C37DFF7A03 <br /> OODD1i' � <br /> 1111 6 <br /> PowennQQ Business Worldwide <br /> Eaton UPS Flex Onsite Service Parts and Labor Coverage <br /> Scope of Work <br /> Attachment R-30 <br /> This scope of work is shared by the power quality equipment types listed in the below table. Note the <br /> applicable features vary by type of equipment being contracted and additional scopes of work may be <br /> required. All checks or processes may not be applicable to all equipment types or models. <br /> Equipment Type Electronics Corrective Battery Corrective Tech <br /> Maintenance Coverage Maintenance Coverage Support <br /> Eaton 3 Phase UPS Yes No Yes <br /> Eaton 1 Phase UPS Yes Yes Yes <br /> Eaton DC Yes No Yes <br /> Eaton PDU/PDR/RPP/STS Yes No Yes <br /> Flywheel Yes No Yes <br /> Non Eaton equipment(MVS) Yes No Yes <br /> If optionally purchased by Customer within the first three (3)years of a Eaton" 3 Phase UPS installation <br /> date (first startup) OR, <br /> If optionally purchased by Customer in conjunction with one or more annual on-site UPS Power Module <br /> Preventive Maintenance SOW R-2 of the same duration, Contractor will provide: <br /> 1. Electronics Corrective Maintenance Coverage: Inspection and repair of the electronic portion <br /> of the UPS (or other equipment type), or"Power Module" shall be performed as needed during <br /> the contracted period of maintenance at no extra charge to Purchaser. Remedial maintenance <br /> provided by Contractor shall include, and be expressly limited to, maintenance to the Power <br /> Module, travel expenses, all necessary parts replacement, adjustments and repairs. If the <br /> Purchaser maintains Eaton spare parts at the maintenance site, Contractor may, at its option, use <br /> those spare parts in the performance of Corrective Maintenance and shall replace the spare <br /> pads, which it so uses, at no cost to the Purchaser. Exclusions: certain wear parts are excluded <br /> from electronics corrective coverage including batteries and full capacitor replacement. All <br /> Corrective Maintenance to Battery System, if any, will be in accordance with battery <br /> manufacturers' warranty or separate agreement, if any. For Flywheel coverage: any failure due <br /> to lack of recommended bearing replacement, vacuum pump replacement(or"major <br /> maintenance" per manufacturer recommendation)will not be included under corrective <br /> maintenance coverage and will be billable at current time and material rates. Eaton 93PM, 9390 <br /> and 9395 UPS models have a special policy on capacitor replacements: DC link capacitors are <br /> eligible for inspection and repair at no extra charge (excludes AC capacitors). <br /> Scope of Work Attachment R-30 <br /> Revision 12/12 <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.