Orange County NC Website
UNC Chapel Hill Permit <br /> Schedule of Compliance Due Date <br /> Duty to Reapply for a Permit Submit a complete application 180 days prior to <br /> I.D.2 permit expiration date <br /> Input for Contingency Plan At least 120 days prior to submitting a renewal <br /> II.Q.1 permit application <br /> Verify emergency Response resources Every 2 years after the permit is issued. <br /> II.Q.2 <br /> Prepare and submit a biennial report Prepare and submit a biennial report on or before <br /> I.G. and II.N.2. March 1 of each even numbered year unless directed <br /> otherwise. <br /> Solid Waste Management Units and Corrective Action <br /> Notification of Newly Identified SWMUs and Within fifteen (15) calendar days of discovery. <br /> AOCs. <br /> Condition IV.C.1 and Condition IV.C.2. <br /> SWMU Assessment Report. Within ninety(90) calendar days of notification. <br /> Condition IV.C.3. <br /> Notification for Newly Discovered Releases at Within fifteen (15) calendar days of discovery <br /> Previously Identified SWMUs and AOCs. <br /> Condition IV.D.1. <br /> Confirmatory Sampling Workplan for SWMUs Within forty-five (45) calendar days after effective <br /> identified in Appendix A. date of permit. <br /> Condition IV.E.1. <br /> Confirmatory Sampling Report. Within sixty(60) calendar days after approval of the <br /> Condition IV.E.4. CS Workplan. <br /> RFI Workplan for SWMU(s) and AOC(s) Within ninety(90) calendar days after the approval of <br /> Identified in Appendix A. the Confirmatory Sampling Report. <br /> Condition IV.F.l.a. <br /> RFI Workplan for SWMU(s) and AOC(s) Within ninety(90) calendar days after receipt of <br /> Identified under Condition IV.C.4., Condition notification by the Department which SWMUs or <br /> IV.D.2., or Condition IV.E.5. AOCs require an RFI. <br /> Condition IV.F.1.b. <br /> E-2 <br />