Orange County NC Website
UNC Chapel Hill Permit <br /> c. Preliminary design criteria and rationale; <br /> d. General operation and maintenance requirements; and <br /> e. Long-term monitoring requirements. <br /> 3. A summary of the RCRA Facility Investigation and impact on the selected corrective <br /> measure or measures; <br /> a. Field studies (ground water, surface water, soil, air); and <br /> b. Laboratory studies (bench scale,pick scale). <br /> 4. Design and Implementation Precautions; <br /> a. Special technical problems; <br /> b. Additional engineering data required; <br /> c. Permits and regulatory requirements; <br /> d. Access, easements, right-of-way; <br /> e. Health and safety requirements; and <br /> f. Community relations activities. <br /> 5. Cost Estimates and Schedules; <br /> a. Capital cost estimate; <br /> b. Operation and maintenance cost estimate; and <br /> c. Project schedule design, construction, and operation. <br /> Copies of the draft shall be provided by the Permittee to the Department. <br /> B. Final <br /> The Permittee shall finalize the Corrective Measure Study Report incorporating comments <br /> received from the Department on the Draft Corrective Measure Study Report. The report <br /> shall become final upon approval by the Department. <br /> C-9 <br />