Browse
Search
2016-543 Solid Waste - State of NC, Division of Waste Management, Hazardous Waste Management Permit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-543 Solid Waste - State of NC, Division of Waste Management, Hazardous Waste Management Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2019 4:59:37 PM
Creation date
9/28/2016 4:48:03 PM
Metadata
Fields
Template:
BOCC
Date
9/28/2016
Meeting Type
Work Session
Document Type
Others
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNC Chapel Hill Permit <br /> PART VII - ORGANIC AIR EMISSIONS REQUIREMENTS FOR PROCESS VENTS AND <br /> EQUIPMENT LEAKS <br /> A. GENERAL INTRODUCTION <br /> In the June 21, 1990, Federal Register, EPA published the final rule for Phase I Organic Air <br /> Emission Standards (40 CFR Parts 264 and 265, Subparts AA and BB) for hazardous waste <br /> treatment, storage, and disposal facilities. Subpart AA contains emission standards for process <br /> vents associated with distillation fractionation, thin-film evaporation, solvent extraction, and air or <br /> steam stripping operations that process hazardous waste with an annual average total organic <br /> concentration of at least ten(10)parts per million (ppm)by weight. SUBPART AA DOES NOT <br /> APPLY TO AIR STRIPPING OPERATIONS USED FOR CORRECTIVE ACTION PURPOSES. <br /> Subpart BB contains emission standards that address leaks from specific equipment(i.e. pumps, <br /> valves, compressors, etc.) that contains or contacts hazardous waste that has an organic <br /> concentration of at least ten(10)percent by weight. <br /> B. ORGANIC AIR EMISSION STANDARDS <br /> The Permittee has no units at the present time to which the Organic Air Emissions Requirements of <br /> 40 CFR 264, Subpart AA (for process vents), and/or Subpart BB (for equipment leaks) as adopted <br /> in 15A NCAC 13A .0113 applies. If the Permittee should change, modify or otherwise identify any <br /> unit that is or has become subject to these regulations, the Permittee is required to comply with all <br /> 40 CFR 264 as adopted in 15A NCAC 13A .0109, Subpart AA and Subpart BB regulations and is <br /> required to submit all 40 CFR 270.24 and 270.25 as adopted in 15A NCAC 13A .0113 <br /> informational requirements within thirty(30) calendar days after implementation of the unit's <br /> modification. <br /> VII-I <br />
The URL can be used to link to this page
Your browser does not support the video tag.