Browse
Search
2016-543 Solid Waste - State of NC, Division of Waste Management, Hazardous Waste Management Permit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-543 Solid Waste - State of NC, Division of Waste Management, Hazardous Waste Management Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2019 4:59:37 PM
Creation date
9/28/2016 4:48:03 PM
Metadata
Fields
Template:
BOCC
Date
9/28/2016
Meeting Type
Work Session
Document Type
Others
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNC Chapel Hill Permit <br /> b. The IM Workplan shall ensure that the interim measures are designed to mitigate any <br /> current or potential threat(s) to human health or the environment and to be consistent <br /> with and integrated into any long-term solution at the facility. The IM Workplan shall <br /> include: the interim measures objectives,procedures for implementation (including any <br /> designs,plans, or specifications), and schedules for implementation. <br /> c. The TM Workplan must be approved by the Department, in writing,prior to <br /> implementation. The Department shall specify the start date of the IM Workplan <br /> schedule in the letter approving the IM Workplan. If the Department disapproves the <br /> IM Workplan, the Department shall either (1)notify the Permittee in writing of the IM <br /> Workplan's deficiencies and specify a due date for submission of a revised IM <br /> Workplan, or(2)revise the IM Workplan and notify the Permittee of the revisions and <br /> the start date of the schedule within the approved IM Workplan, or(3) conditionally <br /> approve the IM Workplan and notify the Permittee of the conditions. <br /> 2. IM Implementation <br /> a. The Permittee shall implement the interim measures in accordance with the approved <br /> IM Workplan. <br /> b. The Permittee shall give notice to the Department as soon as possible of any planned <br /> changes, reductions, or additions to the IM Workplan. <br /> c. Final approval of corrective action required under 40 CFR 264.101 as adopted in 15A <br /> NCAC 13A .0109 which is achieved through interim measures shall be in accordance <br /> with 40 CFR 270.41 as adopted in 15A NCAC 13A .0113 and Condition IV.I. as a <br /> permit modification. <br /> 3. IM Reports <br /> a. If the time required for completion of interim measures is greater than one (1)year, the <br /> Permittee shall provide the Department with progress reports at intervals specified in <br /> the approved workplan. The Progress Reports shall contain the following information <br /> at a minimum: <br /> i. A description of the portion of the interim measures completed; <br /> ii. Summaries of any deviations from the IM Workplan during the reporting period; <br /> iii. Summaries of any problems or potential problems encountered during the <br /> reporting period; <br /> iv. Projected work for the next reporting period; and <br /> IV-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.