Browse
Search
2016-540-E AMS - Triangle Landscaping, Inc. for Homestead Road Sidewalk
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-540-E AMS - Triangle Landscaping, Inc. for Homestead Road Sidewalk
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2019 4:58:03 PM
Creation date
9/28/2016 2:26:48 PM
Metadata
Fields
Template:
BOCC
Date
9/28/2016
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager signed
Amount
$86,850.00
Document Relationships
R 2016-540-E AMS - Triangle Landscaping, Inc. for Homestead Road Sidewalk
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 536C9702-1997-4E72-A2EA-3629ACE96C23 <br /> [Departmental Use Only] <br /> TITLE Homestead Sidewalk <br /> FY FY2016-17 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER$250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the 26th <br /> day of September, 20 16, by and between Triangle Landscaping, Inc., ( hereinafter called the <br /> "Contractor"), and Orange County, a body politic and a political subdivision of the State of North <br /> Carolina, (hereinafter called the "Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br /> Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br /> event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br /> interpreted in the following order of priority: <br /> a. This Agreement. <br /> b. Designer Approved Bulletins and/or Field Orders. <br /> c. Request for Proposals and addenda thereto. <br /> d. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work <br /> required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br /> executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by CRA Associates Incorporated entitled "Sidewalk <br /> Extension for Southern Human Services Campus (Sheet #s C0.0 - C5.0 as indexed on <br /> attached sheet C0.0 and specifications listed within the bid solicitation dated August 15, <br /> 2016) <br /> b. Written specifications prepared by the project engineer. <br /> c. Attached "Sidewalk Extension for Southern Human Services Campus on Homestead <br /> Road" proposal dated August 30th, 2016 which fully describes the work to be performed. <br /> Such work will hereafter be called the "Work". <br /> Revised 6/16 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.