Browse
Search
Agenda - 03-24-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 03-24-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 3:54:21 PM
Creation date
9/27/2016 4:41:42 PM
Metadata
Fields
Template:
BOCC
Date
3/24/1987
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 1 9,1 - <br /> Johnson, the source of raw water for the Hillsborough <br /> town water system which in turn is a source of treated <br /> water for the Orange Water and Sewer Authority, in <br /> times of drought; and <br /> WHEREAS all of the above has created and continues to create a <br /> health hazard that affects a substantial number of the <br /> people of Orange County; and <br /> WHEREAS on September 13, 1984 the Board of Commissioners, <br /> recognizing the risk to the health, safety and welfare <br /> of the people of Orange County affected by the <br /> conditions stated above, found that an emergency <br /> existed which ►•.ar•ranted the issuance by Orange County <br /> of net debt reduction, general obligation bonds in <br /> connection with and for the purpose of repaying it <br /> $200,000.00 loan from the Farmers Home Administration <br /> which loan has been approved in principle by FNMA <br /> along with a grant to Orange County in the amount of <br /> $589,306.00 for the construction by Orange County of a <br /> sewer collection and treatment system to serve the area <br /> of Orange County identified as the principal source of <br /> the risk to the health, safety and welfare of the people <br /> of the County; and <br /> WHEREAS the Board of commissioners now has agreed on the <br /> conditions under which the sewer collection and <br /> distribution system will be constructed. <br /> -2- <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.