Browse
Search
Agenda - 03-10-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 03-10-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 3:42:42 PM
Creation date
9/27/2016 3:19:41 PM
Metadata
Fields
Template:
BOCC
Date
3/10/1987
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
64 <br /> Another area of past problems in the Rural Buffer is the <br /> Falls of New Hope subdivision. Although posing no serious <br /> health risks. coliform bacteria has been detected in some <br /> samples. - <br /> Two additional groundwater problems have also occurred <br /> in the Rural Buffer. Both are unrelated to source pollution. <br /> The middle quarter of Hideaway Estates has had some <br /> problems with dry holes. Aside from this particular instance. <br /> availability of groundwater is not a problem in the Rural <br /> Buffer. The geologic condition in the Rural Buffer poorest <br /> for well yields. Triassic formations. are found only along <br /> the border with Durham County. Even that particular <br /> condition. however. has average yields which are well <br /> within acceptable limits. <br /> High levels of iron and manganese have been detected in <br /> area wells. Hardness is a natural occurance in Orange County <br /> groundwater. though. and these levels are probably unrelated <br /> to any contamination. The presence of these minerals. while <br /> posing no health risk. can present minor odor and staining <br /> problems. <br /> III. asummalissamma <br /> The overriding concern is the provision and maintenance <br /> of safe drinking water supplies to Rural Buffer residents. <br /> The question is whether this can be done with groundwater <br /> supplies in the face of increasing septic tank usage and <br /> potential leachacte problems in the area around the landfill. <br /> The implications of groundwater contamination in the <br /> area near the landfill center on extension of water lines <br /> into the Old Field Creek sub-basin. For other areas of the <br /> Rural Buffer the implications are less clear. <br /> The constant recharge and flow of groundwater will most <br /> likely dilute and eventually eliminate contaminants within a <br /> reasonable amount of time if the source of contamination is <br /> fixed and the amount of pollution is not so much as to <br /> overwhelm the groundwater system. Individual septic tanks can <br /> be repaired and individual wells treated and. to some degree. <br /> protected from further contamination. Water hardness can be <br /> remedied with conditioning equipment. Seepage from the <br /> landfill. though, poses a much greater and more long term <br /> problem than seepage from an individual septic tank. <br /> Extension of water lines is not an inexpensive <br /> proposition. The demand component base charge. acreage <br /> surcharge for a two acre lot. and tap-in fee to tie into an <br /> OWASA water line runs over $2100. with front footage costs <br /> adding at least $1400 more. These costs are exclusive of <br /> force main and waterline installation costs. which run a <br /> minimum of $22.70 per linear foot. <br /> IV. REFERENCES <br /> 1. Orange County Health Department comments. December 1985 <br />
The URL can be used to link to this page
Your browser does not support the video tag.