Orange County NC Website
CHANGE Distribution to: <br /> ORDER OWNER ❑ <br /> AIA DOCUMENT 0701 ARCHITECT ❑ <br /> CONTRACTOR Cl 02"i <br /> FIELD' ❑ <br /> OTHER ❑ <br /> PRO)ECT: RENOVATIONS CHANGE ORDER NUMBER: E.03 <br /> (name,address) Orange County <br /> Historic Courthouse <br /> TO (Contractor): Hillsborough NC INITIATION DATE: Aug 18 86 <br /> P.O.Box Tilley 4y Electric Co Inc <br /> . o 1 <br /> ARCHITECTr S PRO ECT NO: <br /> Research Triangle Park I OC.81 <br /> North Carolina 27709 CONTRACT. FOR: ELECTRICAL <br /> CONSTRUCTION <br /> CONTRACT DATE: March 20, 1985 <br /> You are directed to make the following changes in this Contract: <br /> Perform the Items of Work listed below and make corresponding adjust- <br /> ments to the Contract Sum: <br /> 1. Relocate Emergency Light in Main Stairway: Add $ 74.00 <br /> 2. Install Handicapped Call Button at Front Door <br /> abd Chime in Secretary s Office: Add $ 149.00 <br /> 3. Install conduitnand0outletstfordP/ASSystem: Add <br /> $ 74.00 <br /> 4. Install Outlet and Conduit for Separate <br /> Telephone Line for Clerk/Bailiff Add $ 120.00 <br /> 5. Install additional Emergency Exit Fixture <br /> at Base of Courtroom Exit Stair Add $ 274.00 <br /> 6. Ad•ust Light Fixture Allowance for Final <br /> Selections: <br /> Breakdown: Orig Allowance $ 8000.00 Add $ 1515.34 <br /> Portico Fixture 1350.00* <br /> Misc. Fixtures & <br /> Bulbs 165.34 <br /> Balance Due 1515.34 <br /> TOTAL: <br /> $ 2206.34 <br /> Not valid until signed by both the Owner and Architect. <br /> Signature of the Contractor indicates his agreement herewith. including any adjustment in the Contract Sum or Contract Time. <br /> The original (Contract Sum) (Guaranteed Maximum Cost) was .......................... $ 34 240.00 <br /> Net change by previously authorized Change Orders ....................... . $ 0.00 <br /> The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was........... $ <br /> The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) . . 34 240.00 <br /> by this Change Order . • $ncrease 2 206.34 <br /> The new(Contract Sum) (Guaranteed Maximum Cost)including this Change.Order will be ..• $ 36 446.34 <br /> The Contract Time will be (increased) (decreased) (unchanged) by .• (-0- 1 Days. <br /> The Date of Substantial Completion as of the date of this Change Order therefore is May 5 1986 <br /> Authorized: <br /> ARCHITECT COvTRACTO OWNER <br /> Roman Kolodij/ Wdams & Tilley County of Orange <br /> Address James M Webb Address Electric Co Inc Address North Carolina <br /> Cahoel Hill NC Rurham NC Hillsborough NC <br /> r 1 <br /> BY BY BY <br /> DATE Jan 26 19 DATE DATF <br /> AIA DOCUMENT G741 • CHANCE ORDER • APRIL 1978 EDITION • AIA'P • m 1976 <br /> THE AMERICAN INSTITUTE Of ARCHITECTS.1735 NEW YORK AVE..N.W.•WASHINGTON.D.C.2=16 0701--1978 <br />