Browse
Search
Agenda - 02-17-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 02-17-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 8:40:23 AM
Creation date
9/27/2016 2:14:17 PM
Metadata
Fields
Template:
BOCC
Date
2/17/1987
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE <br /> ORDER 026 OWNERtlon to: D <br /> AlA DOCUMENT C707 ARCHITECT ❑ <br /> CONTRACTOR ❑ <br /> FIELD 0 <br /> OTHER ❑ <br /> PROTECT: RENOVATIONS <br /> (name,address) Orange County CHANGE ORDER NUMBER: G.07 <br /> Historic Courthouse <br /> TO (Contractor): Hillsborough NC INITIATION DATE: Aug 18 86 <br /> Durham Construction Co Inc ARCHITECT'S PROJECT NO: <br /> P.O.Box 15028 27510 OC.81 <br /> Durham NC 27704 0028 CONTRACT FOR: GENERAL <br /> CONSTRUCTION <br /> CONTRACT DATE: March 20, 1985 <br /> You are directed to make the following changes in this Contract: <br /> Perform the Items of Work listed below and make corresponding adjust- <br /> ments to the Contract Sum: <br /> I. Install Structural Bracing at Roof Eaves: <br /> . Add $ 466.42 <br /> 2. Install Concrete Floor Sealer in Main Floor <br /> Stair Lobby and Corridor: Add $ 332.75 <br /> 3. Adjust Finish Hardware Allowance for Special <br /> Strikes for Front and Rear Doors & Install : Add $ 36.32 <br /> 4. Replace Broken/Crackes Window Panes: 15 @ 20.00 Add $ 300.00 <br /> 5. Additional Carpet Installation Labor not covered <br /> under Previous Carpet Allowance Change Order: Add <br /> $ 148.23 <br /> 6. Adjust Toilet Accessories Allowance Deduct <br /> 7. Credit for Deleting ront Door Hinging Change ($ 0.90) <br /> Requiring Call Button and Chime installation <br /> by Electrical Contractor ( $149.00 ) Deduct ($ 149.00) <br /> TOTAL: <br /> $1133.82 <br /> Not valid until signed by both the Owner and Architect. <br /> Signature nl the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Tome. <br /> The original (Contract Sum) (Guaranteed Maximum Cost) was ....... <br /> Net change by previously authorized Change Orders . _ _ .� •�•..•.•• '' $ z47 700.00 , <br /> The (Contract Sum) (Guaranteed Maxim •� ••g•• •'••'.''•'''''• ••• $ 13 769.34 <br /> Maximum Cost) prior to this Change Order was ........., $The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) , 261 469.34 . <br /> by this Change Order . ...... ;ncrease <br /> The new (Contract Sum) (Guaranteed maximum •. •n••• •• •• •• •�•• • 'b*••.•' 262 603.16 <br /> m Cosll including this Change Order will be .., i <br /> The Contract Time will be (increased) (decreased) (unchanged) by _ ' <br /> The Date of Substantial Completion as of the date of this Change Order therefore is May 5�0 1986DayS' <br /> Authorized: <br /> ARCHITECT Roman Kolodi '/ CONTRACTO OWNER <br /> Address James M Webb) Address County urham Constr. Co. Inc County of Orange <br /> Durham NC Address North Carolina <br /> hpel Hill NC Hillsborough NC <br /> BY BY <br /> BY <br /> DATE Jan 2Y/1987 DATE <br /> DATF <br /> AIA DOCUMENT 6701 • CHANGE ORDER • APRIL 1978 EDITION <br /> THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE.,N.W.,WASHINGTON,• 978 <br /> D.C.D'C �W' G701-1978 <br />
The URL can be used to link to this page
Your browser does not support the video tag.