CHANGE Distribution to: <br /> ORDER OWNER ❑ <br /> AJA DOCUMENT 0701 ARCHITECT p <br /> CONTRACTOR ❑ <br /> FIELD p <br /> OTHER ❑ <br /> PROJECT: RENOVATIONS CHANGE ORDER NUMBER: G.07 <br /> (name, address) Orange County <br /> Historic Courthouse <br /> TO (Contractor): Hillsborough NC INITIATION DATE: Aug 18 86 <br /> Durham Construction Co Inc <br /> 112 Brittania Ave ARCHITECT'S PROJECT NO: OC.81 <br /> P.O.Box 15028 27510 <br /> Durham NC 27704 0028 CONTRACT. FOR: GENERAL <br /> CONSTRUCTION <br /> CONTRACT DATE: March 20, 1985 <br /> You are directed to make the following changes in this Contract: <br /> Perform the Items of Work listed below and make corresponding adjust- <br /> ments to the Contract Sum: <br /> I. Install Structural Bracing at Roof Eaves: Add $ 466.42 <br /> 2. Install Concrete Floor Sealer in Main Floor <br /> Stair Lobby and Corridor: Add $ 332.75 <br /> 3. Adjust Finish Hardware Allowance for S ecial <br /> Strikes for Front and Rear Doors & Ins all : Add $ 36.32 <br /> 4. Replace Broken/Crackes Window Panes: 15 @ 20.00 Add $ 300.00 <br /> 5. Additional Carpet Installation Labor not covered <br /> under Previous Carpet Allowance Change Order: Add $ 148.23 <br /> 6. Adjust Toilet Accessories Allowance Deduct ($ 0.90) <br /> 7. Credit for Deleting Front Door Hinging Change <br /> Requiring Call Button and Chime installation <br /> by Electrical Contractor ( $149.00 ) Deduct ($ 149.00) <br /> TOTAL: $1133.82 <br /> Not valid until signed by both the Owner and Architect. <br /> Signature of the Contractor indicates his agreement herewith, including any adjustment-in the Contract Sum or Contract Time. <br /> The original (Contract Sum) (Guaranteed Maximum Cost) was ..... ...................... $ 247 700.00 <br /> Net change by previously authorized Change Orders .......... ............. . $ 13 769.34 <br /> The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was .......... E 261 469.34 <br /> The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) <br /> by this Change Order ............. ..... .............. Sncrease 1 133.82 <br /> The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be .. $ 262 603.16 <br /> The Contract Time will be (increased) (decreased) (unchanged) by (-0- ) Days. <br /> The Date at Substantial Completion as of the date of this Change Order therefore is May 5 1986 <br /> Authorized: <br /> ARCHITECT Roman Kol odi j/ coNTRACTOr�urham Constr. Co. Inc OWNER County of Orange <br /> Address James M Webb Address <br /> Durham NC Address North Carolina <br /> hpel Hill NC Hillsboroug NC <br /> By BY BY <br /> DATE Jan 2 19$7 DATE DATF <br /> AIA DOCUMENT 0701 CHANGE ORDER • APRIL 19711 EDITION AIAIF 1778 <br /> THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE..N-W.,WASHINGTON, D.C. 20(X)6 0701--1978 <br /> A <br />