Browse
Search
Agenda - 02-17-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 02-17-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 8:40:23 AM
Creation date
9/27/2016 2:14:17 PM
Metadata
Fields
Template:
BOCC
Date
2/17/1987
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> i(Section'b-continued) �- <br /> 5. Redesigns ordered by the OWNER after final plans have been accepted by the OWNER and FmHA, except redesigns <br /> to reduce the project cost to within the funds.available. <br /> 6. Appearances before courts or boards on matters of litigation or hearings related to the project. <br /> 7. Preparation of environment impact assessments or environmental impact statements, i <br /> 8. Performance ofndetailed staking necessary for construction of the project in excess of the control staking set forth <br /> in Section AN <br /> 01,21-fog <br /> Payment for the services specified in this Section D shall be as agreed in writing between the OWNER and approved by <br /> FmHA prior to commencement of the work. Baring unforeseen circumstances, such payment is estimated not to <br /> exceed$ 16.00Q.00 ,The ENGINEER will render to OWNER for such services an itemized bill,separate _ <br /> from any other billing, once each month, for compensation for services erformed hereunder during u <br /> p g s ch period, <br /> the same to be due and payable by OWNER to the ENGINEER on or before the 10th day of the following period. <br /> SECTION E-INTEREST ON UNPAID SUMS <br /> If OWNER fails to make any payment due ENGINEER within 60 days for services and expenses and funds-are avail- <br /> able for the proiect then the ENGINEER shall be entitled to interest at the rate of 12 percent <br /> per annum from said 60th day,not to exceed an annual rate of 12 percent. <br /> SECTION F-SPECIAL PROVISIONS <br /> The Preliminary Report was prepared by The John McAdams Company. Hazen and Sawyer <br /> does not accept cost: estimates stated in the report. <br /> The Request for Proposal issued by Orange County and the proposal of the ENGINEER, <br /> Hazen and Sawyer, are incorporated herein by reference and shall be considered <br /> part of this contract, the terms of which shall be complied with to the extent not <br /> inconsisten-t with other provisions of this contract. <br /> Changes for this agreement are attached. <br /> :? <br /> i <br /> t <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.