Orange County NC Website
SECTION B-COMPENSATION FOR ENGINEERING SERVICES <br /> 1. The OWNER shall compensate the ENGINEER for preliminary engineering - services in the sum of. <br /> non—a licable Dollars($ ) <br /> after the review and approval of the preliminary engineering report by the OWNER and FmHA. <br /> 2. The OWNER shall compensate the ENGINEER for design and contract administration engineering services in the <br /> amourtt <br /> �}•.$�sbown in Attacbmentl <br /> When Attachment 1 is used to establish compensation for the design contract administration services, the <br /> actual construction costs on which compensation is determined shall exclude legal fees, administrative costs, <br /> engineering fees, land rights, acquisition costs, water costs, and interest expense incurred during the construc- <br /> tion period. <br /> 3. The compensation for h , esign'and contract administration services shall be payable <br /> as follows: 'fo <br /> (a) A sum-whW k equal%J�seventy percent (70%) of the total compensation payable under Section B-I and 2,after <br /> completion and submission of the construction drawings,specifications,cost estimates,and contract documents, <br /> and the acceptance of the same by OWNER and FmHA. <br /> (b) A sum which, together with the compensation provided in Section'B-3-(a) above,equals eighty percent (80 17o) <br /> of the compensation payable immediately after the construction contracts are awarded. <br /> (c) A sum equal to fifteen percent(15%)of the compensation will be paid on a monthly basis for general engineering <br /> review of the contractor's work during the construction period on percentage ratios identical to those approved <br /> by the ENGINEER as a basis upon-which to make partial payments to the contractor(s). However,payment <br /> under this.paragrph and of such additional sums as are due the ENGINEER by reason of any necessary ad- <br /> justments in the payment computations will be in an amount so that the aggregate of all sums paid to the ENGI- <br /> NEER will equal ninety-five (95%) of the compensation.-A_final payment to equal 100 percent Shall be made. <br /> when it is determined that all services required by-this Agreement have been completed except for the services <br /> set forth in Section A':4,.hereof. <br /> SECTION C-COMPENSATION FOR RESIDENT INSPECTION AS SET <br /> FORTH IN SECTION A`1+ <br /> {3 <br /> When the ENGINEER provides resident inspection, the ENGINEER will, prior to the preconstruction conference, <br /> submit a resume of the resident inspector's qualifications,anticipated duties and responsibilities for approval by the OWNER <br /> and FmHA. The OWNER agrees to pay the ENGINEER for such services in accordance with the schedule set out in Attach- <br /> merit 1. The ENGINEER will render to OWNER for such services an itemized bill, once each month, for compensation for <br /> such services performed hereunder during such period,the same to be due and payable by the OWNER to the ENGINEER on <br /> or before the 10th day of the following period.Ondem onsf2d , <br /> 44 110 be <br /> SECTION D--ADDITIONAL ENGINEERING SERVICES <br /> In addition to the foregoing being performed, the following services maybe provided UPON PRIOR WRITTEN AUTHOR- <br /> IZATION 01:TIIE OWNER and written approval of FnliIA. <br /> I. Site surveys for water treatment plants, sewage treatment works,dams, reservoirs,and other similar special surveys as <br /> may be required. - <br /> 2. L•ihoralory tests, well lesls, horings, specialized geological, soils, hydr:mlic, or other sludies recommended by [lie <br /> I:N(;INlatilt/� <br /> 3. Property surveys, detailed description of sites, maps,drawings,or estimates related thereto;assistance in negotiating <br /> for land and casement rights. <br /> a. Necestary data and filing Wraps for water rights,water adjudication,and litigation. <br /> -3- <br />