Orange County NC Website
Page 8 <br /> Other Needs (Cont.) <br /> 1990-93 0 6 4 <br /> Roof Projects 1. Orange High Gym $ .0+0+2 <br /> 2. G. A. Brown (full <br /> refurbishment) 450,000 <br /> G. A. Brown 3. Increase staff parking <br /> behind cafeteria -57- <br /> Efland-Chheeks 4. Addition - gym storage <br /> and office (increased <br /> population) 50,000 <br /> C. W. Stanford 5. Total renovation of baseball <br /> and football fields (erosion <br /> control problem) 25,000 <br /> 6. Renovate old tennis courts <br /> to convert to outdoor <br /> basketball area and <br /> remove old basketball <br /> area (settling problem) 4174140- <br /> Cameron Park 7. Driveway and parking <br /> • <br /> improvement 21,000 <br /> Central Elementary 8. Replace - hard surface play <br /> area .&,-000- <br /> 9. Resurface teacher parking lot -6751a0- <br /> A. L. Stanback 10. Remove Building 300 <br /> (demolish and regrade site) -8-,-000- <br /> Systemwide 11. General site improvement <br /> (erosion control, fence <br /> repairs, etc.) 50,000 <br /> Sub-total $ 746,$00- 596,000 <br /> Inflation (20%) -145,166- 119,200 <br /> Total $ $7.2-,-] O- 715,200 <br /> Future Needs <br /> K-6 Elementary School (700 students) <br /> Project Cost $5,506,000 <br /> Inflation (25%) 1,376,500 <br /> Total $6,882,500 <br /> Category Total $.8.-9-330-}=- 8,431,159 <br /> Grand Total $2$70427166. 19,018,890 <br /> • <br />