Orange County NC Website
AIM <br /> 056 Page 2 <br /> Renovation of Buildings Which Are Suitable for Long-range Use <br /> 1987-90 <br /> G. A. Brown 1. Rewire AV roam for computer lab <br /> purposes (BEP) $ 5,000 <br /> Efland-Cheeks 2. Complete paving of faculty <br /> parking 17500 3. Redesign of bus entrance for curb <br /> and gutter (safety) 666 <br /> 4. Rewire AV room for computer lab <br /> purposes (BEP) 5,000 <br /> C. W. Stanford 5. Redesign/remodel old dressing room for <br /> instruction and multi-purpose use 90,000 <br /> Orange High 6. Pave second student parking lot not <br /> funded in renovation work 60,000 <br /> 7. Complete guidance/media center - <br /> renovation not funded in Phase I 300,000 <br /> Central Elem. 8. Rewire AV roam for computer lab <br /> purposes (BEP) 00 <br /> Sub-total $4,47661)-465,000 <br /> Inflation (10%) .46 500 <br /> Total $52i7466 511,500 <br /> 1990-93 <br /> G. A. Brown 1. Remodel door and ventilation system <br /> to reduce noise and heat loss problem $ 6tl6O6 <br /> 2. Replace the original carpet installed <br /> in 1974 <br /> fielfto <br /> 3. Install two classroom <br /> partitions to <br /> Efland-Cheeks 4. provide space for BEP requirement 10,000 <br /> Replace the carpet installed in <br /> 1979 during full renovation 424499 <br /> Orange. High 5. Air condition remainder of the <br /> buildings and redesign/remodel windows 560,000 <br /> Cameron Park 6. Classroom carpet and tile replacement <br /> which is currently 6 years old 4i7is6 <br /> Central Elem. ' 7. Recarpet classrooms (installed in <br /> 1974) <br /> Sub-total �� <br /> Inflation (20%) $ -9/76735e 570,000 <br /> 1-83-,450- 114,000 <br /> Total $171$67369 684,000 <br /> Category Total $-17621751E0 1,195,500 <br />