Orange County NC Website
Page 7 <br /> Other Needs <br /> 1987-90 <br /> Central Elementary Addition (5 classrooms plus bathrooms) <br /> Classrooms 900 square feet each - 4,500 sq. ft. <br /> 'ibilets, circulation 30% of above - 1350 <br /> 5,850 sq. ft. <br /> Central Elementary 1. Construction Cost $ 351,000 'ibtal <br /> 2. Architect (8%) 28,080 Project <br /> 3. Contingency (3%) 10,530 / Cost: <br /> 4. Furnishings (8%) 28,080 $417,690 <br /> Roof Projects 5. A. L. Stanback (Building 100 <br /> and cafeteria) fe@Te99 <br /> 6. Orange High boiler building <br /> and agriculture shop ”-fie <br /> 7. G. A. Brown interim _ repairs <br /> 8. Central Elementary (1975 <br /> addition) 200,000 <br /> Efland-Cheeks 9. Redesign of amphitheater <br /> and general landscape work 20,000 <br /> C. W. Stanford 10. Sidewalk and steps from ' <br /> cafeteria area to football <br /> practice field (safety) 1508 <br /> Orange High 11. Establish a new special ' <br /> purpose exit from the north- <br /> west side of the campus 10,000 <br /> 12. Resurface drive behind the <br /> home side of the football stadium R--700 <br /> 13. Multi-purpose practice fields (2) 60,000 <br /> 14. Multi-purpose outside storage <br /> building (30 x 40) -i4reee <br /> Cameron Park 15. Storm drain installation <br /> (erosion control) 4480= <br /> Central Elementary 16. Construct an access/service <br /> road to the back of the <br /> building (fire protection) 37090 <br /> Systemwide 17. General site improvement (erosion <br /> control, fence repairs, curb & <br /> gutter installation, sidewalk <br /> repairs) 50,000 <br /> Sub-total $±787±7899 757,690 <br /> Inflation (10%) i-69,±89 75,769 <br /> Total $±;±997Af9 833,459 <br />