Orange County NC Website
DQLJ.er, zurnace, uut:L i.Ga6cL , ......... ..GU444 . ..-- —____ _____ `. <br /> • air distribution system, etc.) _ - <br /> First Unit 08 i - 40.00 a <br /> Each additional unit 10-00 <br /> - <br /> Replacement of a system 40.00 - _ <br /> Commercial heating and cooling (with combined: systems including <br /> the distribution system, boiler, furnace, ductwork: etc.) <br /> First Unit • 4.0.00 _ - <br /> ••• Each additional unit 10.00 <br /> '• Replacement of a system • 40.00 - _ - <br /> Commercial •Ventilation and Exhaust Systems Uncludes fans, -, <br /> blowers and duct system for removal . of - dusta, gases. - fvaaes. ., <br /> vapors. etc.) • . - -One system. - - 40.00 - -- _ _ - - <br /> Each additional system : • 30.00 - <br /> • . Hood fan commercial type cooking equipment - -20.00 - - - _ - - _. <br /> ' Commercial range or grill (each unit) . - 20.00 - _ -- _ - . <br /> Deep fat fryer . - - - -20.00 - - _ - <br /> Oven .- - . - - 20.00 _ - <br /> SCHEDULE L _ - _ - <br /> - <br /> _ Joint Planning Inspection Fees - <br /> - All projects approved under the terms of the a nint Planning <br /> A reement between Orange County and the Town of Chapl�Bil shall <br /> pay the fo owing fees prior to the recording of a especial Use <br /> Permit or Final Plat of a major subdivision:- - <br /> Street and storm One percent (1t) of the <br /> drainage improvements , total constru <br /> those im rovements. to be constructed <br /> • to Town of Chapel Dill standards <br /> Water and sewer • Two percent (2%) of the - <br /> i rovements total construction cost of - <br /> those improvements to be constructed_e <br /> to T____ own of Chapel U3.11 standaras <br /> '_ Where •ro"ects are to be built in 'bases, fees ana Sae prr rated~ <br /> •ase• on t .e cost o improvements scheduled in each phase . - - <br /> ....�„ <br />