Browse
Search
Agenda - 01-20-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 01-20-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 2:24:10 PM
Creation date
9/27/2016 12:04:28 PM
Metadata
Fields
Template:
BOCC
Date
1/20/1987
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 4 , r <br /> ARTICLE 14 <br /> BASIS OF COMPENSATION <br /> The Owner shall compensate the Architect for the Scope of Services provided, in accordance with Article 6, Payments <br /> to the Architect, and the other Terms and Conditions of this Agreement,as follows: <br /> 14.1 AN INITIAL.PAYMENT of dollars(S 0.00 ) <br /> shall be made upon execution of this Agreement and credited to the Owner's account as follows: <br /> 14.2 BASIC COMPENSATION <br /> 14.2.1 FOR BASIC SERVICES,as described in Paragraphs 1.1 through 1.5,and any other services included in Article 15 <br /> as part of Basic Services, Basic Compensation shall be computed as follows: <br /> (Here insert basis of compensation, including fixed amounts,multiples or percentages,and identify Phases to which particular methods of compensa- <br /> tion apply,it necessary.) <br /> A fixed amount of five thousand five hundred dollars ($5,500) for schematic design, <br /> design development, construction documents and bidding/negotiations. An amount <br /> not to exceed one thousand dollars ($1,000) for construction administration. <br /> 14.2.2 Where compensation is based on a Stipulated Sum or Percentage of Construction Cost, payments for Basic <br /> Services shall be made as provided in Subparagraph 6.1.2, so that Basic Compensation for each Phase shall <br /> equal the following percentages of the total Basic Compensation payable: <br /> (Include any additional Phases as appropriate_! <br /> Schematic Design Phase: percent( %) <br /> Design Development Phase: $2,100 percent( %) <br /> Construction Documents Phase: percent( %) <br /> Bidding or Negotiation Phase: $3,400 percent( %) <br /> Construction Phase: (Not to Exceed) $1,000 percent( %) <br /> 14.3 FOR PROJECT REPRESENTATION BEYOND BASIC SERVICES,as described in Paragraph 1.6,Compensation shall <br /> be computed separately in accordance with Subparagraph 1.6.2. <br /> AIA DOCUMENT BM •OWNER-ARCHITECT AGREEMENT• THIRTEENTH EDITION• JULY 1977• MAe• Q 1577 <br /> THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 2141+1977 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.