Orange County NC Website
r' <br /> Mr. Ken Thompson <br /> • <br /> • <br /> January 13, 1987 <br /> Page 2 <br /> 2. Specific items to be included are: <br /> • New Construction. <br /> • Demolition. <br /> • Details. <br /> • Notes Covering HVAC and Electrical Changes. <br /> • Finishes in the New First Floor Courthouse Waiting <br /> . Room. <br /> 1. Due to the fact that our estimate of the castor <br /> construction will be less than $30,000, we will execute the <br /> bid as a "Negotiated Proposal This allows us to invite <br /> three general contractors to bid with the understanding <br /> that they are responsible for all of the sub-contractors <br /> involved in the renovations. <br /> facatrus <br /> 1. This Phase shall consist of weekly site visits and shop <br /> drawing reviews for a period of approximately two months. <br /> Etta: <br /> 1. Our proposed fee for the work described above will be: <br /> • Schematic Design and <br /> • Design Development $ 2,100 <br /> • Construction Documents and <br /> • Bidding and Negotiation $ 1,400 <br /> • Total $ 5,500 <br /> • <br /> 2. Construction administration would be handled on an hourly <br /> basis not to exceed $1,000 (one thousand dollars). <br />