Browse
Search
Agenda - 01-20-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 01-20-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 2:24:10 PM
Creation date
9/27/2016 12:04:28 PM
Metadata
Fields
Template:
BOCC
Date
1/20/1987
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> TERMS AND CONDITIONS OF AGREEMENT BETWEEN OWNER AND ARCHITECT <br /> ARTICLE 1 ments to previous Statements of Probable Construction <br /> ARCHITECT'S SERVICES AND RESPONSIBILITIES Cost indicated by changes in requirements or general <br /> market conditions. <br /> BASIC SERVICES 13.4 The Architect shall assist the Owner in connection <br /> The Architect's Basic Services consist of the five with the Owner's responsibility for filing documents re- <br /> phases described in Paragraphs 1.1 through 1.5 and quired for the approval of governmental authorities hay- <br /> include normal structural, mechanical and electrical ing jurisdiction over the Project. <br /> engineering services and any other services included 1.4 BIDDING OR NEGOTIATION PHASE <br /> in Article 15 as part of Basic Services. 1.4.1 The Architect, following the Owner's approval of <br /> 1.1 SCHEMATIC DESIGN PHASE the Construction Documents and of the latest Statement <br /> 1.1.1 The Architect shall review the program furnished of Probable Construction Cost, shall assist the Owner in <br /> by the Owner to ascertain the requirements of the Project obtaining bids or negotiated proposals, and assist in <br /> and shall review the understanding of such requirements awarding and preparing contracts for construction. <br /> with the Owner. 1.5 CONSTRUCTION PHASE ADMINISTRATION <br /> 1.1.2 The Architect shall provide a preliminary evalua- OF THE CONSTRUCTION CONTRACT <br /> tion of the program and the Project budget requirements, <br /> 1.5.1 The Construction Phase will commence with the <br /> each in terms of the other, subject to the limitations set award of the Contract for Construction and together with <br /> forth in Subparagraph 3.2.1. the Architect's obligation to provide Basic Services under <br /> 1.1.3 The Architect shall review with the Owner alterna- this Agreement,will terminate when final payment to the <br /> tive approaches to design and construction of the Project. Contractor is due, or in the absence of a final Certificate <br /> 1.1.4 Based on the mutually agreed upon program and for Payment or of such due date,sixty days after the Date <br /> Project budget requirements, the Architect shall prepare, of Substantial Completion of the Work,whichever occurs <br /> for approval by the Owner,Schematic Design Documents first. <br /> consisting of.drawings and other documents illustrating 1.5.2 Unless otherwise provided in this Agreement and <br /> ..-. the scale and relationship of Project components. incorporated in the Contract Documents, the Architect <br /> 1.1.5 The Architect shall submit to the Owner a State- shall provide administration of the Contract for Construe- <br /> • ment of Probable Construction Cost based on current tion as set forth below and in the edition of MA Docu- <br /> area,volume or other unit costs. ment A201, General Conditions of the Contract for Con- <br /> 7.2 DESIGN DEVELOPMENT PHASE struction,current as of the date of this Agreement. <br /> 1.2.1 Based on the approved Schematic Design Docu- 1.5.3 The Architect shall be a representative of the <br /> ments and any adjustments authorized by the Owner in Owner during the Construction Phase, and shall advise <br /> t pre- and consult with the Owner. Instructions to the Contrac- <br /> the program or Project budget, the Architect shall <br /> p for shall be forwarded through the Architect. The Archi- <br /> pare, for approval by the Owner, Design Development tent shall have authority to act on behalf of the Owner <br /> Documents consisting of drawings and other documents only to the extent provided in the Contract Documents <br /> to fix and describe the size and character of the entire unless otherwise modified by written instrument in ac- <br /> Project as to architectural,structural,mechanical and elec- cordance with Subparagraph 1.5.16. <br /> trical systems, materials and such other elements as may <br /> 1.5.4 The Architect shall.visit the site at intervals ap- <br /> be appropriate. propriate to the stage of construction or as otherwise <br /> 1.2.2 The Architect shall submit to the Owner a further agreed by the Architect in writing to become generally <br /> Statement of Probable Construction Cost., . familiar with the progress and quality of the Work and to <br /> 1.3 CONSTRUCTION DOCUMENTS PHASE determine in general if the Work is proceeding in accord- <br /> 7.3.1 Based on the approved Design Development Doc- ance with the Contract Documents. However, the Archi- <br /> 1.3.1 <br /> and any further adjustments in the scope or qual- tent us on-site not bn reqund o make exhaustive or uan- <br /> ity of the Project or in the Project budget authorized by t'y of a Wo inspections.-On a check the quality or quan- <br /> ity Owner, the Architect shall tit of the Work.�n the basis of such on-site observa- <br /> prepare, for approval by tions as an architect, the Architect shall keep the Owner <br /> the Owner, Construction Documents consisting of Draw- informed of the progress and quality of the Work, and. <br /> ings and Specifications setting forth in detail the require- shall endeavor to guard the Owner against defects and <br /> ments for the construction of the Project. deficiencies in the Work of the Contractor. <br /> 1.3.2 The Architect shall assist the Owner in the prepara- . 1.5.5 The Architect shall not have control or charge of <br /> tion of the necessary bidding information, bidding forms, and shall not be responsible for construction means,' <br /> the Conditions of the Contract, and the form of Agree- methods, techniques, sequences or procedures, or for <br /> ment between the Owner and the Contractor. safety precautions and programs in connection with the <br /> 1.3.3 The Architect shall advise the Owner of any adjust- Work, for the acts or omissions of the Contractor, Sub- <br /> AIA DOCUMENT 0141•OWNER-ARCHITECT AGREEMENT• THIRTEENTH EDITION• JULY 1977•AIA9•di)1977 <br /> THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 B141-1977 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.