<br />    		1.7.1   Providing analyses of the Owner's needs, and pro-      struction, and furnishing services as may be required in
<br />  	--.      gramming the requirements of the Project.			connection with the replacement of such Work.       	'
<br />   		1.7.2  Providing  financial  feasibility  or  other  special       1.7.16  Providing services made necessary by the default
<br />   		studies.  								of the Contractor, or by major defects or deficiencies in
<br />   		1.7.3  Providing planning surveys, site evaluations, envi-       the Work of the Contractor, or by failure of performance
<br />   		ronmental studies or comparative studies of prospective	f nithuc the Owner or Contractor under the Contract for
<br />      											C
<br />   		sites, and preparing special surveys, studies and submis-       Construction.
<br />   		sions required for approvals of governmental authorities       1.7.17  Preparing a set of reproducible record drawings
<br />   		or others having jurisdiction over the Project.     		showing significant changes in the Work made during
<br />   		1.7.4  Providing services relative to future facilities, sys-       construction based on marked-up prints, drawings and
<br />   		tems and equipment which are not intended to be con-       other data furnished by the Contractor to the Architect.
<br />   		strutted during the Construction Phase.       		-    1.7.18  Providing extensive assistance in the utilization of
<br />  		1.7.5  Providing services to investigate existing conditions       any equipment or system such as initial start-up or testing,
<br />									g    		adjusting and balancing, preparation of operation and
<br />  		or facilities or to make measured drawings thereof, or to       maintenance manuals, training personnel for operation
<br />  		verify the accuracy of drawings or other information fur-       and maintenance, and consultation during operation.
<br />  		Wished by the Owner.
<br />     											1.7.19  Providing services after issuance to the Owner of
<br />  		1.7.6  Preparing  documents  of  alternate,  separate  or       the final Certificate for Payment, or in the absence of a
<br />  		sequential bids or providing extra services in connection       final Certificate for Payment, more than sixty days after
<br />  		with bidding, negotiation or construction prior to the       the Date of Substantial Completion of the Work.
<br />  		completion of the Construction Documents Phase, when
<br />  		requested by the Owner.     					1.7.20  Preparing to serve or serving as an expert witness
<br />     											in       	with 1.7.7  Providing  coordination  of  Work  performed  by      ceeding or connection
<br />      													proceeding ublic hearing, arbitration pro-
<br />  		separate contractors or by the Owner's own forces.       	1.7.21   Providing services of consultants for other than
<br />  		1.7.8  Providing services in connection with the work of       the normal architectural, structural, mechanical and elec-
<br /> 		a construction manager or separate consultants retained       trical engineering services for the Project.
<br /> 		by the Owner: 							1.7.22  Providing any other services not otherwise in-
<br /> 		1.7.9  Providing Detailed Estimates of Construction Cost,       cluded in this Agreement or not customarily furnished in
<br /> 		analyses of owning and operating costs,or detailed quan-       accordance with generally accepted architectural practice.
<br /> 		tity surveys or inventories of material, equipment and
<br /> 		labor.    								1.8  TIME
<br /> 		1.7.10  Providing interior design and other similar ser-       1.8.1   The Architect shall perform Basic and Additional
<br /> 		vices required for interior
<br />       					connection with the selection,similar ser-       Services as expeditiously as is consistent with professional
<br /> 		vices re required
<br /> 				or r installation o  in connection ctionuwi furnishings he	and       skill and care and the orderly progress of the Work. Upon
<br /> 		related equipment,     						request of the Owner, the Architect shall submit for the
<br />   											Owner's approval a schedule for the performance of the
<br />		1.7.11   Providing services for planning tenant or rental       Architect's services which shall be adjusted as required as
<br />		spaces.  								the Project proceeds,and shall include allowances for peri-
<br />   											ods Making revisions in Drawings, Specifications or       ods of time required for the Owner's review and approval
<br />		1.7.12
<br />			documents when such revisions are inconsistent io    o	of submissions and for approvals of authorities having
<br />		with written approvals is we or instructions previously are    	en       jurisdiction over the Project.This schedule,when approved
<br />		are required by the enactment or revision of codes, laws       ex by
<br />       											the Owner,a Arl not, except for reasonable cause, be
<br />		or regulations subsequent to the preparation of such doc-
<br />		uments or are due to other causes not solely within the
<br />		control of the Architect. 									ARTICLE 2
<br />       	1.7.13   Preparing Drawings,Specifications and supporting  		THE OWNER'S RESPONSIBILITIES
<br />       	data and providing other services in connection with
<br />       	Change Orders to the extent that the adjustment in the       2.1   The Owner shall provide full information regarding
<br />       	Basic Compensation resulting from  the adjusted Con-       requirements for the Project including a program, which
<br />       	struction Cost is not commensurate with the services re-       shall set forth the Owner's design objectives, constraints
<br />       	quired of the Architect,provided such Change Orders are      and criteria, including space requirements and relation-
<br />       	required by causes not solely within the control of the       ships, flexibility and expandability, special equipment and
<br />       	Architect.       							systems and site requirements.
<br />       	1.7.14  Making investigations, surveys, valuations, inven-      2.2  If the Owner provides a budget for the Project it
<br />       	tories or detailed appraisals of existing facilities, and serv-       shall include contingencies for bidding, changes in the
<br />      	ices required in connection with construction performed       Work during construction, and other Costs which are the
<br />      	by the Owner,  							responsibility of the Owner, including those described in
<br /> 											this Article 2 and in Subparagraph 3.1.2. The Owner shall,
<br />     .--      1.7.15   Providing consultation concerning replacement of      at the request of the Architect, provide a statement of
<br />      	any Work damaged by fire or other cause during con-       funds available for the Project,and their source.
<br />      	AIA DOCUMENT B141 •OWNER-ARCHITECT AGREEMENT• THIRTEENTH EDITION• JULY 1977•MA.•ID 1977
<br />      	THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006
<br />     																	B141-1977  5