Orange County NC Website
( ( <br /> 1bAcess is not as time consuming. Since there is <br /> Ilr more rooru to accomodate the necessary erosion control <br /> devices, the plans usually involves only a few de- <br /> vices and an uncomplicated construction schedule. <br /> For these reasons the review process is brief and <br /> should be reflected in the fee schedule. <br /> Just as the review process is simpler -for rural <br /> sites, the inspection of these sites during construe- <br /> . tion is less involved and time consuming. Meese site <br /> require fewer inspections because they are not com- <br /> plicated, and the duration of the construction is <br /> usually much shorter than urban construction because <br /> extensive structures are not involved. <br /> 4r, <br /> (6._ <br />