Browse
Search
Agenda - 01-05-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 01-05-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 2:18:52 PM
Creation date
9/27/2016 11:34:41 AM
Metadata
Fields
Template:
BOCC
Date
1/5/1987
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71 <br /> CHANGE 007 Distribution to: <br /> ORDER OWNER ❑ Dail Dixon & Associates <br /> AJA DOCUMENT G707 ARCHITECT ❑ Suite.220A Carr Mill <br /> CONTRACTOR 0 Carrboro, NC 27510 <br /> FIELD ❑ <br /> OTHER ❑ <br /> PROJECT: Orange County Animal CHANGE ORDER NUMBER: 3 <br /> (name, address) Shelter Expansion <br /> INITIATION DATE: 12110/86 <br /> TO (Contractor): <br /> —1 ARCHITECT'S PROJECT NO: 85/101 <br /> Holt Construction Co. CONTRACT FOR: Orange County Animal <br /> PO Drawer 118 Shelter Expansion <br /> Graham, NC 27253 <br /> CONTRACT DATE: 3/17/86 <br /> You are directed to make the following changes in this Contract: <br /> Provide a slide bolt and two locksets per final inspection <br /> punch list, dated October 6, 1986, interior items 13. and <br /> 14. , and per Holt Construction Co. invoice dated <br /> December 5, 1986. <br /> Not valid until signed by both the Owner and Architect. <br /> Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time_ <br /> The original (Contract Sum) > ) was $ 56,460.00 <br /> Net change by previously authorized Change Orders $ 438.70 <br /> The(Contract Sum) (60221eateirktda:ciavaxocCirot prior to this Change Order was $ 56,898.70 <br /> The (Contract Sum) (It itacata7 d: mtrt €90 will be (increased) gr1 f raMi <br /> by this Change Order $ 224.00 <br /> The new (Contract Sum) (fiNIXaMiCltddhetirMIXingtincluding this Change Order will be $ 57,122.70 <br /> The Contract Time will be (i ce jck91faigdk(unchanged)by C 0 ) Days. <br /> The Date of Substantial Completion as of the date of this Change Order therefore is <br /> Authorized: <br /> Dail Dixon & Associates _ Holt Construction Co. Orange County <br /> ARCHITECT CONT CT R <br /> Suite 220A Cara_ Mill Drawer 118 OWN T06 E. M argaret Lane <br /> Address Address Address <br /> Carrboro, NC 27510 Graham, NC 27253 Hillsborough, NC 27278 <br /> BY • <br /> BY BY <br /> DATE 12 , DATE DATE <br /> AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1978 EDITION • AIAA • @ 197g <br /> THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W.,WASHINGTON, D.C.200nb <br />
The URL can be used to link to this page
Your browser does not support the video tag.