Browse
Search
Agenda - 12-16-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 12-16-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 2:01:37 PM
Creation date
9/27/2016 10:56:34 AM
Metadata
Fields
Template:
BOCC
Date
12/16/1986
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
071 <br /> writing by the Town Engineer and Town Superintendent of Utilities in order to <br /> insure its compatibility with the Town's wastewater collection and treatment <br /> facilities and policies. <br /> 2 . The County agrees to pay the Town $15, 000. 00 as a blanket <br /> availability (tap) fee for the privilege of connecting the Efland-Cheeks <br /> Elementary School wastewater facility and the County's initial 212 customers to <br /> the Town's system. The customer list and map will be provided to the Town not <br /> later than the 1st day of July, 1985. Five thousand dollars of the $15, 000 is <br /> for the availability associated with the Efland Cheeks Elementary School. The <br /> above $15, 000 availability fee shall be paid before any wastewater is permitted <br /> to flow through the meter. <br /> 3 . The Town agrees to treat, at the rates herein prescribed, up to <br /> 55, 000 gallons of the County system's wastewater per day, which is the <br /> equivalent of the wastewater generated by said school and the initial 212 <br /> customers of the County's wastewater collection system, and to treat up to an <br /> additional 325, 000 gallons per day for additional customers in the future. <br /> 4. No customer shall be allowed to connect to the County system unless <br /> and until such customer's proposed discharge has been found acceptable by both <br /> the Town Water Superintendent and County. Approval shall be predicated on (1) <br /> the quality of the effluent of the potential user being compatible with the <br /> Town's NPDES discharge permit, (2) compliance with the Town's ordinance, rules, <br /> and regulations concerning pretreatment of industrial wastewater, and (3) all <br /> County (subdivision, zoning, erosion, building, etc. ) and State (DOT, etc. ) <br /> permits having been properly granted. Under no circumstances will the County <br /> permit the discharge of septic sewage into its system. <br /> 5. After the first 212 customers above specified, each additional <br /> approved customer shall pay a $400 Town availability fee. Customers other than <br /> those initially connected from among those initially applying for connection <br />
The URL can be used to link to this page
Your browser does not support the video tag.