O�s 7 SECTION B-COMPENSATION FOR ENGINEERING SERVICES •
<br /> •
<br /> 1. The• ()wNER shall compensate the ENGINEER for preliminary engineering services. in the sum of
<br /> Dollars(S __ )
<br /> after the review and approval of the preliminary eu .::.:ieri;g report by the C)\VNER and l r;i11A.
<br /> 2. The OWNER shall compensate the ENGINEER design and contract administration engineering services in the
<br /> arrow cu
<br /> ]:! o-f:-(:;�i�'w�c l l :i� -
<br /> } '@
<br /> When Attachment 1 is used to establish compensation for the design." r:';l�contract alministratiori ter ices, the
<br /> actual construction costs on which compensation is determined shall exclude lcga` adminit.ritive costs,
<br /> engineering fees, land rights, acquisition costs, water costs, and interest expense in :red during the construc-
<br /> tion period.
<br /> 3. The compensation for i1'i'°:rn str-t :iii—e-aer i"n design and Contract administration services shall be payable
<br /> as fo:_iows: To
<br /> (a) A surii-:-rik*i equalseventy percent (70%) of the total compensation payable under Section h-1 and 2,after
<br /> completion and submission of the construction drawings,specifications,cost estimates,and contract documents,
<br /> and the acceptance of the s.;arne by OWNER and F-niHA.
<br /> (b) A shin which, together with the compe nsation provided in Section'B:3 (a) above, equals eighty percent (8O%)
<br /> o` ti, cot npea;',tu)o kay_ ,de i inm:,dial:.`y after the CC]lsiructic,l uonrract:,are awarded,
<br /> (c) A sum equal to fifteen percent(15%)of the compensation will be paid on a monthly basis for general engi i•sering
<br /> review of the contractor's work during the construction period on percentage ratios Elentical to those a.p.proved
<br /> •
<br /> by the ENGINEER as a basis upon which to make partial. pay;:ients to the contractor(s). However,payment
<br /> Udder t' is paragraph and of such additlonl si'-us as are du' the Ei•''GINE.ER by season of any necessary- ad-
<br /> . justments in the paynrent computations will be in an amount so that the aggregate of all sums paid to the ENGI-
<br /> lfiLER will equal ninety-five (95%) of the compensation. A_finaI payment to equal 100 percent shall be made. 1
<br /> when it is determined that al! services required by-thus Agreement have been completed except for the services �1
<br /> set forth in Section A ;l.,.hercof_
<br /> SECTION C-COMPENSATION ATION FOR RESIDENT INSPECTIONr AS SET
<br /> FORTH IN SECTION A`r?
<br /> •
<br /> When the ENGINEER provides resident inspection, the ENGINEER will, prior to the preconstruction conference,
<br /> submit a resume of the resident inspector's gwilificetions,anticipated duties and responsibilities for approval by the OWNER
<br />• and Fin}IA. The Oir1NER agrees to pay the ENGINEER for such services in accordance with the schedule set out in Attach-
<br /> ment I. The ENGINEER will render to OWNER for such services an iternized bill, once each month, for compensation for
<br /> such services performed hereunder during such period,the same to be due and payable by the OWNER to the ENGINEER on
<br /> or before the loth day of the following period;i ;.:-?''is.617
<br /> i';IG4=C'Y�t�'.___ - _:_ _-w^_- _'"^. _"l}.:'•: ^i•r`E-`r3sc .:-7:b :-cr__�,�. •�r'c.!}'�-�-.-. ._� 9�.}:}]a.r!�:�z:-3-L�y-'.'` .. f` _ .
<br /> SECTION D- ADDITIONAL ENGINEERING SERVICES
<br /> In addition to the foregoing being performed, the following services may be provided UPON PRIOR WRI.1 fEN AUTHOR-
<br /> IZATION OF TIIt::OWNEi:and written approval of Fail iA.
<br /> . I. Site surveys for water treatment plants, sewage treatment works,dams, reservoirs, and other similar special surveys-as
<br /> play be required. - .
<br /> 2. L!burltnry tests, well tests, borings, specialized geoloi'.ic:11, sni!s, ilydiatrlic, ru- oilier sludiccs recommended by the
<br /> •
<br /> 3. t'r'ope l)' : :1veys, detailed description of Sites, maps, drawings,or estimates related thereto:assistance in negotiating
<br /> for land and easement right'.
<br /> d`iac:esi,::'y data . d filial;snaps for water rights,water adjudication,and litigation.
<br /> -3.