Browse
Search
Agenda - 12-16-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 12-16-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 2:01:37 PM
Creation date
9/27/2016 10:56:34 AM
Metadata
Fields
Template:
BOCC
Date
12/16/1986
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j •. hit; ONO V 2 51985 <br /> El HAZER AHD SAWYER, R.C. <br /> CONSULTING ENGINEERS <br /> November 25, 1985 <br /> Mr. Kenneth R. Thompson <br /> County Manager <br /> 106 East Margaret Lane <br /> Hillsborough, NC 27278 <br /> Dear Mr. Thompson: <br /> With reference to Section D of our Agreement with Orange - <br /> County, please see the attached proposals from Soil & Material <br /> Engineers relative to the recommended subsurface investigations <br /> and R.T. Newcomb, Jr. , relative to the easement and. property <br /> acquisition surveys for the Cheeks Township Sewer Improvements, <br /> Phase 1. The cost of this work is billable to the County as <br /> an Additional Service per Section D of the Agreement. The cost <br /> breakdown per the proposal from each subconsultant is as follows: <br /> Item Subconsultant Estimated Cost <br /> Property Surveys R.T. Newcomb, Jr. $14, 500a <br /> Subsurface Investigations S&ME 14, 945 <br /> TOTAL ESTIMATED COST $29,445 <br /> a Does not include Orange County recording fees for the 10-12 <br /> . plats anticipated. It is assumed that this cost will be paid <br /> by the County. <br /> The present cost ceiling for Additional Services from <br /> Section D of our Agreement is $16, 000. It will not be possible <br /> to perform the work required for this amount, and it is requested <br /> that this ceiling be increased to $30, 000. We attribute this <br /> higher cost to anticipated difficulties in completing the <br /> property surveys based on our present knowledge of the properties <br /> involved and a higher than anticipated cost for the subsurface <br /> investigations. We feel that it is important if not absolutely <br /> necessary to maintain the level of service described in each <br /> subconsultants proposal and recommend that the County approve the <br /> increased cost ceiling. <br /> 4300 GLENWOOD AVENUE■P.O.BOX 30428•RALEIGH,NORTH CAROLINA 27622•(919)782-8333 <br /> OFFICES IN NEW YORK.RALEIGH.AND HOLLYWOOD.FLORIDA <br />
The URL can be used to link to this page
Your browser does not support the video tag.