Orange County NC Website
• <br /> SECTION B-CO.IPENSATION FOR ENGINEERING SERVICES • <br /> • <br /> The OWNER ' shall compensate the ENGINEER for preliminary engineering services in the sum of <br /> (non-applicable) • Dollars(S . ) - <br /> after the review and approval of the preliminary eng;neerina report by the OWNER and FmHA. <br /> 2. The OWNER shall compensate the ENGINEER for design and contract administration engineering services in the . <br /> • amount - sc l ) Jr <br /> • <br /> `Csl�`i4:`'/h'nr+in A+tact.~l?nt 1.. ¢IhP <br /> \Then Attachment 1 is used to establish compensation for the design- .Nlcontradt administratio.n services, the <br /> actual construction costs on which compensation is determined exclude Izga'•. ':•ss, administrative costs, <br /> engineering fees, land rights, acquisition costs, water costs, and interest expense i:.•..,:red during the construc- <br /> tion period. <br /> 3. The compensation for fin.:- - :.b ._.ri--r, design and contract administration services shall be payable <br /> as follows: TO • <br /> (a) A sum-n-lt. equanilseventy percent (70%) of the total compensation payable under Section F;-1 2nd 2,after <br /> • completion and submission of the construction drawings,specifications,cost estimates,and contract documents, <br /> and the acceptance of the sarite by OWNER and Fn►HA. <br /> (b) A suin Which, together with the compensation,provided in Section•B-3•(a) above,equals eighty percent (80 77..) <br /> of •:e coax rcotiarr = •le immeui_el, .fter the construction contniets are a:.a;wed. <br /> (c) A sum equal to fifteen percent(155l,)of the compensation will be paid on a monthly'basis for general engineering <br /> 1 during the construction period on percentage ratios identical to those approved <br /> review of the contractor's work during <br /> by the ENGINEER as a basis upon-which to make partial payments to the contractor(s). However,payme t <br /> • <br /> t :-.r this� �.1r oaoh and o` su ch a_ddition:l sums as are tht�.�tile E.?.n 1 k:E i :-by rea. so _of.an y necessa:j <br /> justments in the payment computations will be in an amount so that the avercgate of all surns paid to the <br /> NEER will equal ninety-five (95%) of the compensation..fl final payment to equal l00 percent shall be made. <br /> when it is determined that all services required by-this Agreement have been completed except for the services <br /> set forth in Section A"-- hereof. <br /> SECTION C -COMPENS!'.TION FOR RESIDENT INSPECTION AS SET <br /> • FORTH IN SECTION <br /> => <br /> When the ENGINEER provides resident inspection, the ENGINEER R will, prior to the precanstruction conference, <br /> submit a resume of the resident inspector's qualifications,anticipated duties and responsibilities for approval by the OWNER <br /> and FmHA. The OWNER ecrees to pay the ENGINEER for such services in accordance with the schedule set out in Attach- <br /> ment I. The ENGINEER will render to OWNER for such services an itemized bill, once each month, for compensation for <br /> such services performed hereunder during such period,the same to be due and payable by the OWNER to the ENGINEER on <br /> or before the 10th day of the following period. . ..: :-::w_... <br /> dJ_, -- -.. -.� <br /> SECTIO?, D ADDITIONAL ENGINEERING SERVICES . <br /> In addition to the foregoing being pe rformed, the following services may be provided UPON PRIOR WRITTEN AUTHOR. <br /> IZ AfION OF THE OWNER and written approval of F:iil lA, <br /> I. Site surveys for water treatment plants, sewage treatment worl_s, darns, reservoirs,and other similar special Surveys 2s <br /> may be required. - - <br /> 2. 1_:!bu;:':nay tests, ,ell lusts. Irori!%. ;, spcci:llixcd tiri!s, hydraulic, or other studies reConnnucn:lcd by time <br /> 3. Property surveys, detailed description of sites, maps, drawings, or estimates related thereto;assistance in negotiating <br /> for land and casement rights. <br /> 4. Necessary data mind filing nrims for water rights,water adjudication,and litigation. <br /> -3- - <br />