Browse
Search
Agenda - 12-16-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 12-16-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 2:01:37 PM
Creation date
9/27/2016 10:56:34 AM
Metadata
Fields
Template:
BOCC
Date
12/16/1986
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
& JUN 18 1987 <br /> HAZEN AND SAWYER, p. • <br /> CONSULTING ENGINEERS <br /> June 16 , 1987 <br /> Mr . Kenneth R . Thompson <br /> County Manager <br /> County of Orange <br /> 106 East Margaret Lane <br /> Hillsborough , NC 27278 <br /> Re : Final Engineering Budget <br /> Efland-Cheeks Township <br /> Sanitary Sewer Facilities - Phase I <br /> Dear Mr . Thompson: <br /> With the award of a construction contract, we have <br /> achieved a significant milestone in the Efland sewer project. <br /> I am sure at times that this accomplishment appeared <br /> unattainable to all parties involved. We are happy to have <br /> been in a position to assist you in this endeavor. <br /> Based on the award of contract, we are now able to <br /> provide you with a final budget cost for engineering services . <br /> The proposed budget is based on bid prices as awarded and will <br /> be subject to adjustment based on the final construction cost. <br /> In determining the estimated total fee , we have relied on the <br /> percentage tables developed by the Farmers Home Administration <br /> and conversation with Mr . Tom Honeycutt of FmHA in Raleigh . <br /> The computations of total fee are summarized in Attachment 1 . <br /> For calculation hThese� categori1esare construction <br /> as follows : <br /> costs 1 <br /> Category A - includes construction costs for those <br /> portions of the project that were designed , bid , and <br /> contracts awarded. Fees in this category are based on <br /> 100 percent of the design rate plus the rate for resident <br /> engineering . <br /> Category B - includes those portions of the project that <br /> were designed , bids received , but not included in <br /> contract award . Alternative C , which consists of the <br /> collection sewers in Efland, falls into this category. <br /> The fee is based upon 80 percent of the design rate . <br /> 4300 GLENWOOD AVENUE P.O.BOX <br /> 0428,O 30428 • <br /> NC RALEIGH,NORTH CAROLINA NA 27622 <br /> nsi 22 (919)782-8333 <br /> RALEIGH,NC <br />
The URL can be used to link to this page
Your browser does not support the video tag.