Orange County NC Website
" CHANGE Distribution to: <br /> ORDER OWNER ❑ <br /> ARCI•IIl CCT ❑ <br /> AM DOCUMENT 6701 CONTRACTOR 0 <br /> FIELD ❑ <br /> • OTHER 0 <br /> PROJECT: Carr Building Renovation CHANGE ORDER NUMBER: 4 <br /> (name.address) ' <br /> INITIATION DATE: December 9, 1986 <br /> TO (Contractor): . <br /> ARCHITECT'S PROJECT NO: 5568 <br /> D.W. Ward Construction Co. I <br /> P.O. Box 15157 CONTRACT FOR: General Construction <br /> Durham, North Carolina . 27704 <br /> CONTRACT DATE: August 13, 1986 <br /> You are directed to make the following changes in this Contract: .. .. <br /> Item 1: Deduct for sidewalk at laundromat Credit $ 581.00 <br /> Item 2: Deduct for toilet partitions, change from <br /> ceiling hung to floor mounted Credit $ 144.00 <br /> Item 3: Add sheetrock and furring at front of <br /> plumbing store to cover large holes in <br /> masonry walls Extra $ 980.00 <br /> Item 4: Build 2 catwalk platforms in ceilings to <br /> access HVAC units Extra $ 650:00 <br /> Item 5: Add door lock to existing door at back of <br /> plumbing store Extra $ 111,00 <br /> rY= <br /> D <br /> Resultant Change Order Amount i � r-ti) ,016.00 <br /> 2 <br /> DEC 24 1966 <br /> D.W. WARD CONST. Cu., INC. <br /> \..1 ....lid until%ignotl by built 11w C) nr•r and Archil►•rl. <br /> Isign,rlurr 111 IIu•CunIr.►r lur aI(raolnr•nl herewith. in►biding.toy adju>Inu•nt in the Contract Sum Of rontr.0 I loom. <br /> The original IContracl Sum)Iy{gonnxIK icntjmg gajd was $ 221,856.00 <br /> Net change by previously authorized Change Orders <br /> $ 6,481.00 <br /> The (Contract Sun) l M7iibinVIAXI<13aliRCI►'if) prior to this Change Order was S 224,897.00 <br /> The (Contract Sum) IX7Gli}C1)CQUIMEirdich ifUX►XIJ will be (increased) liC .l'ilENKpi�Xl(,�) <br /> - by this Change Order $ 1,016.00 . <br /> The new (Contract Sun11 IxY17(K1761i13I:1 Q1\13(Qi1Xti3KC(Kal including this Change Order will be $ ` 225,913.00 <br /> The Contract Time will be (increased) (141C dfrlC3CiX'iIdKICIGlEl33ii1W,Jd) by Ten ( 10 I Days. <br /> The Date of Substantial Completion as of the dale of [his Change Order therefore is March 9, 1987 • <br /> Authorized: <br /> CHR Associates, PA _ D.W. Ward Construction Co. County of Orange <br /> /3AtlLII I t Road ('ONIK.u:loe OWNER. <br /> Box 75157 106 E. Margaret LAne <br /> \rhlr.•.. Arl ltr ss Addrraa <br /> Chapel Hill, NC 27514 Durham, NC 27704 Hillsborough, NC 7278 <br /> % l,�s 1J/Ce By <br /> 6 f6:0 <br /> I):\IL � 1)All:�2+'� ZC}��je DATE l �, <br /> AIA DOCUMENT C7U1 • (IIAN(,r. 0111II R • AI•R11 1978 1.1•11111 IN • AI:\' • 0. •14711 <br /> 1111 :WI RICAN I\OIDUD 01 AR(111)rrrs 1711 NI W vt)RK.wr.. N.W.. It I.V. t).C. .1I101M. G701—1976 <br />