Orange County NC Website
ARTICLE 8.2,4 SE'CCiFIC STANDA;,. `fA,LL SPECIAL USES {"Ves" .Incllrates compliance; "No" indicates noncompliance) K3 <br /> Ordinance Re uirements Planning Board Findings Based . <br /> nn Sithmittarl 4, 1;.--tionEvidence 'Submitted to Support 'Findings' Fin] ings <br /> Article 8.2.4 requires the applicant � . <br /> to address the following: <br /> a} Method and adequacy provision <br /> fa <br /> far sewage disposal facilities, X Yes No OWASA' indicated that the proposed Yes' No <br /> solid waste and water service internal and utility layout is <br /> adequate and that the off-site <br /> extension-proposals are acceptable <br /> (Oral comment received 3-3-$6 from <br /> John Greene, Asst. Chief Engineer) <br /> OWASA has indicated need for <br /> minimum 6" water and $" sewer lines. <br /> bj Method and adequacy of police, X Yes No Service agencies have indicated -No <br /> fire and rescue squad protec- willingness and ability to serve Yes <br /> tian the site <br /> . (see attached letters) , <br /> c} Method and adequacy of vehicle X Yes �No -Loop road system satisfies Chapel Hill Yes <br /> access to the site and traffic staff -concerns with fire protection :.. —No <br /> conditions around the site service accessibility, to site. NCDOT <br /> expressed concerns with sight <br /> distance looking east from easternmost <br /> entrance and indicated a preference <br /> for a single versus a dual access {oral <br /> comments received 3-4-86 from- Dwight <br /> Kelly, Division Traffic inglneer), <br /> Chapel Hill Transportation Planner -04assifies <br /> Eubanks Road as ultimately t. - ng as a <br /> minor �rterlal- (See Cond' h <br />