Browse
Search
Agenda - 12-01-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 12-01-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 1:55:00 PM
Creation date
9/27/2016 9:56:58 AM
Metadata
Fields
Template:
BOCC
Date
12/1/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t 043 appropriate for this project. <br /> (Payment-in-lieu recommended was initially $12.823, now <br /> $10,702, based on 120 units. Payment-in-lieu based on <br /> 1987 assessed valuation as required by ordinance. County <br /> considered method used by Chapel Hill in determining <br /> payment-in-lieu at time ordinance was under consideration <br /> for adoption but elected to use "assessed valuation" <br /> method. JPA Agreement indicates that Orange County <br /> standards will be followed.) <br /> 3 . Proposed development is inappropriately located with <br /> respect to pattern and timing of existing and proposed <br /> development in the Comprehensive Plan, and with repsect <br /> to public and private facilities existing or clearly to <br /> be available by the time the development reaches the <br /> stage where they will be needed. <br /> (JPA Land Use Plan adopted 10-13-86 designates area as <br /> Office-Institutional. Chapel Hill plan designates Mixed- <br /> Use, a similar designation. Orange County Zoning <br /> Ordinance permits single-family and multi-family <br /> development in 0-I district. Chapel Hill "Mixed-Use" <br /> designation permits similar uses. <br /> Area south of Eubanks Road is designated "Suburban <br /> Residential", permitting 1-5 units per acre. Chapel Hill <br /> Interim Land Use Plan recommends "Medium Density" <br /> residential, permitting 4-8 units per acre. Proposed <br /> density of 6.25 units per acre, based on 120 units, is in <br /> keeping with pattern of development. <br /> Council Member Preston indicated a preference of 33% site <br /> coverage. The applicant, by reducing the number of units, <br /> had reduced site coverage to 45% from 48%. The MTC <br /> District requires 25% of site to be left in open space. <br /> The 55% open space area proposed by the applicant through <br /> buffers and recreation areas is more than double that <br /> required by ordinance. <br /> Concerns about timing and the availability of public <br /> facilities are met either through assurances of service <br /> by OWASA or through the phasing of the project with <br /> respect to 1-40 completion. The applicant testified at <br /> the public hearing that the project phasing completion <br /> dates were off by as much as six months. With the <br /> reduction in number of units, traffic generation would be <br /> reduced from 1068 trips per day to 936 trips. If <br /> reductions in units were made in Phase 5, 26 units, and <br /> Phase 6, 23 units, and project phasing were moved back <br /> six months, total traffic from the project using 1-40 <br /> prior to its opening in the summer of 1989 would be 468 <br /> trips. This would represent 50% of total project traffic. <br /> The Staff report also indicated that 40% of all trips <br /> would be during peak hours or travel-to-work periods. The <br /> remaining 60% of trips for shopping and entertainment- <br /> 562-would be during non-peak hours. Based on the revised <br /> phasing referenced above, 187 trips per day would be <br /> during peak hour periods prior to the opening of 1-40. <br />
The URL can be used to link to this page
Your browser does not support the video tag.