Browse
Search
Agenda - 12-01-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 12-01-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 1:55:00 PM
Creation date
9/27/2016 9:56:58 AM
Metadata
Fields
Template:
BOCC
Date
12/1/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
040 <br /> Power, Southern Bell, and Village Cable before issuance <br /> of the Special Use Permit. All lines shall be <br /> . underground. Sewer lines and facilities shall be sized <br /> in a manner consistent with the adopted Land Use Plan <br /> for the Joint Planning Area. <br /> 7. That all required easement documents be recorded prior <br /> to initiation of construction activity. <br /> 8. That a stormwater management plan with hydrologic <br /> calculations be approved by the Orange County Manager <br /> and the Town Manager prior to issuance of the Special <br /> Use Permit. <br /> 9. That a soil erosion and sedimentation control plan be <br /> approved by the Orange County Erosion Control Officer <br /> before issuance of the Special Use Permit, <br /> 10. That a detailed landscaping plan be approved by the <br /> County Manager and Town Manager prior to the issuance of <br /> a Special Use Permit. Construction fences, protecting <br /> areas of the site that are to remain undisturbed, <br /> shall be erected and maintained during all construction <br /> activity. <br /> 11. That all structures be erected in compliance with <br /> applicable building codes following application for <br /> and issuance of building permits. <br /> 12. That the phasing of the project be revised as follows: <br /> PROPOSED-Phase 5 RECOMMENDED-Phase 7 <br /> Phase 6 Phase 5 <br /> Phase 7 Phase 6 <br /> 13. That the final site plan and narrative of the project, <br /> incorporating all changes, deletions and additions <br /> through the final approval of the project, be <br /> incorporated herein and made a part of this Planned <br /> Development Special Use Permit. Copies of the final <br /> site plan and narrative are to remain on file with <br /> the Orange County Planning Department and Chapel Hill <br /> Planning Department. Grading and building permits, <br /> upon application, will be issued after approval and <br /> recordation of the. Special Use Permit. <br /> 14. That a final boundary survey of the Planned Development <br /> including public improvements and utility easements be <br /> recorded by the developer upon issuance of the Special <br /> Use Permit. <br /> 15. That the grantee of this Special Use Permit post with <br /> Orange County, in a form acceptable to the County <br /> Attorney, a bond or letter of credit in an amount equal <br /> to the cost of all public improvements plus 10% . The <br /> amount shall be determined on the basis of fully <br /> executed construction contracts or certification by a <br /> registered engineer employed by the grantee of this <br /> Special Use Permit. Security for construction of the <br /> improvements in this project may follow phasing in the <br />
The URL can be used to link to this page
Your browser does not support the video tag.