Orange County NC Website
ORANGE COUNTY <br /> BOARD OF COMMISSIONERS <br /> 125 <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: December 1, 1986 <br /> Action Agenda <br /> Itemtlio <br /> SUBJECT: MORATORIUM ON APPLICATION OF LANDSCAPING STANDARDS <br /> (SECTION IV-B-8-c-1 OF SUBDIVISION REGULATIONS) <br /> *************************************************************************** <br /> DEPARTMENT: PLANNING PUBLIC HEARING: Yes_X_No <br /> *************************************************************************** <br /> ATTACHMENTS: Section IV-B-8-c-1 CONTACT: Marvin Collins <br /> of Subdivision <br /> Regulations TELEPHONE NUMBERS: <br /> Hillsborough 732-8181 <br /> Chapel Hill 967-9251 <br /> Durham 688-7331 <br /> Mebane 227-2031 <br /> *************************************************************************** <br /> PURPOSE: To consider placing a moratorium on the <br /> enforcement of Section IV-B-8-c-1 of the <br /> Subdivision Regulations until a study is <br /> completed by the Planning Board of the standards <br /> contained therein. <br /> NEED; On August 4, 1986. the Board of Commissioners <br /> adopted Section IV-B-8 of the Subdivision <br /> Regulations, establishing landscaping and buffer <br /> requirements for new subdivisions. Since <br /> adoption of the provisions, a particular problem <br /> area has been identified - application of the <br /> standards of Section IV-B-8-c-1 . <br /> The standards contained in Section IV-B-8-c-1 <br /> require that trees be planted in front, side and <br /> rear yard setback areas if no trees existed there <br /> previously. Trees must be spaced 35 feet on <br /> center in the front yard area along proposed <br /> streets. Similar spacing is required in side and <br /> rear yards but overall coverage is limited to one <br /> tree per 1.000 square feet of ground area. <br /> Similar requirements also apply to proposed <br /> recreation/open space areas. <br /> Problems identified include the cost of <br /> installation of plant materials, particularly <br /> when including side and rear yard areas. spacing <br /> requirements for plant materials, and the type of <br /> plant materials to be installed. <br />