Browse
Search
2016-538-E AMS - Harris Brothers Electric & Controls, Inc. to install control unit and power
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-538-E AMS - Harris Brothers Electric & Controls, Inc. to install control unit and power
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 8:13:44 AM
Creation date
9/27/2016 8:07:32 AM
Metadata
Fields
Template:
BOCC
Date
9/26/2016
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Manager signed
Amount
$1,722.00
Document Relationships
R 2016-538-E AMS - Harris Brothers Electric & Controls, Inc. to install control unit and power
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 152624D9-C913-4DA9-84D5-72704A709310 <br /> Harris Bros. Electric 85 Controls, Inc. <br /> 2712 Hillsborough Road <br /> Durham, NC 27705 <br /> Phone: (919) 220-8500 ** Fax: (919) 220-7009 <br /> BID PROPOSAL <br /> Date: September 1, 2016 <br /> To: Allen Dorman <br /> Company: Orange County <br /> Phone: 919-619-8859 <br /> E-mail: adormanAorangecountync.gov <br /> From: Calvin Harris <br /> Company: Harris Bros. Electric & Controls, Inc. <br /> Telephone: (919) 220-8500 <br /> Fax: (919) 220-7009 <br /> Email: calvinrharris@msn.com <br /> Project: Hillsborough Inspections Building <br /> Scope of Work: <br /> Option #1: <br /> • Mount the control unit and server to the concrete wall in the basement electrical <br /> room <br /> • Core drill through the 2nd and 3rd floors and install a 20A/120V dedicated circuit <br /> from the GE Panel in the Data room on the 3rd floor to the new UPS Control panel <br /> in the basement. <br /> • Install a 3/4" EMT conduit with a pull string for control wiring by others from the <br /> control unit to the new server <br /> Total Option #1: $1,722.00 (One Thousand, Seven Hundred Twenty-Two Dollars) <br /> Option #2: <br /> • Same as Option #1, but the new UPS to be fed from the existing Panel R1 <br /> in the basement electrical panel <br /> Total Option #2: $810.00 (Eight Hundred Ten Dollars) <br /> Notes: <br /> • Work to be done during normal business hours. <br /> • Bid good for 30 days. <br />
The URL can be used to link to this page
Your browser does not support the video tag.