Browse
Search
Agenda - 11-18-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 11-18-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 12:16:21 PM
Creation date
9/26/2016 4:50:56 PM
Metadata
Fields
Template:
BOCC
Date
11/18/1986
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 065Commercial Heating (Installation of a heating system including <br /> boiler, furnace, duct heater, unit heater, air handling units and <br /> air distribution system, etc.) <br /> First Unit 40.00 <br /> Each additional unit 10.00 <br /> Replacement of a system 0 40.00 <br /> Commercial heating and cooling (with combined system including <br /> the distribution system, boiler, furnace, ductwork.:,20e1.) <br /> First Unit 40.00 <br /> Each additional unit 10.00 <br /> Replacement of a system 40.00 <br /> Commercial Ventilation and Exhaust Systems (includes fans& <br /> blowers and duct system for removal of dust, gases& fumes, <br /> 0 00 vapors, etc.) <br /> , <br /> One system 40.00 <br /> Each, additional system 10.00 <br /> Hood fan commercial type cooking equipment 20.00 <br /> Commercial range or grill (each unit) <br /> Deep fat fryer 20.00 <br /> Oven 20.00- <br /> SCHEDULE L <br /> Joint Planning Inspection Fees <br /> All •ro*ects a. roved under the terms of the Joint Plannin. <br /> Agreement between Orange County and the Town of Chapel Rill shall <br /> pay the following fees •rior to the recordin. of a Siecial Use <br /> Permit or Final Flat of a ma *or subdivision: <br /> Street and storm One percent (1%) of the <br /> drainaeinvements, total construction cost of <br /> those imirovements to be constructed <br /> to Town o Chaiel Hill standards <br /> Water and sewer 0 IHE_EtE9211tiaLALL412 <br /> IMPI9,312M2Bla 0 total construction cost of <br /> those im.rovements to be constructed <br /> to Town of Cha.el Hill standards <br /> Where •ro *ects are to be built in •hases, fees ma be •ro-arated <br /> rased on t e cost o improvements scheduled in each phase. <br /> ..43,.+Wt.- <br />
The URL can be used to link to this page
Your browser does not support the video tag.