Orange County NC Website
_ . • <br /> 1 <br /> Mr . Kenneth R. Thompsqn 040 <br /> November 12, 1986 <br /> Page 2 <br /> 4. Site observation of the work during construction. We <br /> do not envision providing full -time observation but <br /> will make periodic inspections during the course of the <br /> work including a final inspection to verify that the <br /> work has been completed in accordance with plans and <br /> specifications . <br /> We understand that the County is also contemplating <br /> modifications to various other water front structures to <br /> • accommodate the increase in lake level . We understand that our <br /> services are not needed for these improvements and have excluded <br /> these items from our scope of service . <br /> We propose to provide the above services under a salary cost <br /> times a multiplier fee reimbursement arrangement as outlined in <br /> the attached Statement of Standard Charges with a cost ceiling <br /> establiShed at $10, 000, unless mutually modified by the County of <br /> Orange and Hazen and Sawyer , P. C. <br /> If the above conditions are acceptable to you , please sign <br /> in the space provided below and return one (1 ) copy to us for our <br /> records . This letter with each of our signatures shall" act as <br /> the engineering contract for the above services . <br /> Very truly yours , <br /> HAZE AND SAWYER . P.C. <br /> - <br /> Ade, <br /> GordoniC. P E <br /> .- 9 • • <br /> Vice Presiden <br /> DLC/jhl <br /> • Enclosure <br /> • <br /> Approved by: <br /> • Don Willhoit, Chairman <br /> Orange County Commissioners <br /> • <br />