Orange County NC Website
, . <br /> ., . . <br /> CHANGE S . . . <br /> Distribution ID: <br /> _ <br /> ORDER S OWNI,R K ° <br /> ARCI-1111:CT <br /> • . <br /> AM DOCUMENT G701 CONTRACTOR N <br /> 034 . <br /> FIELD 0 <br /> •• <br /> OTIAR 0 <br /> PROJECT: Carr Building Renovation - CHANGE ORDER NUMBER: 3 <br /> 4 na me,address) <br /> INITIATION DATE:November 12, 1986 <br /> To (Contractor): <br /> ... <br /> ARCHITECT'S PROJECT NO: 5568 <br /> 7, W. Ward Construction Company-1 <br /> P. 0; Box 15157 CONTRACT FOR:General Construction <br /> Durham, North Carolina 27704 <br /> L J CONTRACT DATE:August 13, 1986 <br /> You are direded to make the hdlowing changes in this Contract: <br /> . Item 1 ' 3 1/2" kraft faced fiberglass insulation above . <br /> all new layin ceiling s. (6800 sq.ft. @ 29csq.ft.) - extra $ 10989.00 <br /> - <br /> Item 2 Grout and rub scarred brick above front entry <br /> and patch and paint cinder block walls of plumbing <br /> store. <br /> extra $ 661.00 <br /> • Item 3 Patch and paint ceiling with 5/811 fire rated . <br /> sheetrock where soffit was remoVed 'and paint <br /> • existing 12" x 12" ceiling tiles. H extra $ 3,371.00 ' <br /> Item 4 Frame out access door to water supply and add <br /> support post wrapped in sheetrock at end of low <br /> wall in Planning Department reception. . extra $ 167.00 <br /> Xtem 5 8 units of levelastic applied to level floor -.. <br /> _ <br /> where terrazzo was removed. extra $ 293.00 <br /> Resultant Change Order Amount • ' extra $ 6,481.00 <br /> N s t solid unlit signed by Inith II»)miter and Art1111441. <br /> *.fitimittrat 1111 1114,01111rad kir ill4lic,th.,his agreement herewitli. int hiding any adjustment in are Contract sum or Contra)t lune. <br /> • the irriginal (Contrac t Sum) triNffirt41440/441iyilitiaish was ........................... $ 221.856.00 <br /> Net change by previously aulhorb,ecl Change Orders --- ....---—--. $ 40221.00 <br /> The(contract Sunn iribofija/10/1AWAtijiliftyyyttrir to this Change Order was ........" $ 218,416.00•'lice (Contract Sum) itiobw(MilliiihiNniiivl will be (increased) yyyprip d - <br /> WNW?) <br /> by this Change Order • $ 6 481.00 <br /> The new(Contra(I Sum) (AtehalcieWiNii4111AitAgbfincluding obis Change Order will he ... $ <br /> The Contra(t Time will he (increased) filktirkAWIiitilkiiiit4Oliby ten (10) days 224'0897 .00• I 10 I Day' <br /> The Date of Substantial Completion as of the date 4)f this Change Order therefore is March 9, 1987. <br /> Authorized <br /> • : <br /> CHR Associates D.W.Ward Construction Co. vCount of Oran-e <br /> • . 9oNiZiirm7"------- , 01;11N 1—t--• _ pAir ort Rd. P 0 B 15157 <br /> --- <br /> Atlihey.7-------"------------------ -__Jt. . OX <br /> Atlt In..% <br /> Atklir..s, <br /> • Cha el 441-1, 11_ -C. 2 5 Dnrhs Hillsborough, N.C. <br /> • m, N...Cilink______ <br /> - --7,- -,-------7,./._--- <br /> 1)U1 iZa,,,_,,e,..__Z 1./A 11E <br /> DA rE - • <br /> 414 DOCUMENT GM! • (I!ANN' 1/111H I ' APRI1 14711 1 P11 It IN * . Pr» • <br /> 1111 AM111 1(11'4N INS1111111 1 all A (111111 (s, 1711 NI W V111(1%• Vt..NAV.,W WIINI.ItiNt.Mt', ANL,. <br /> C701-197 <br />