Browse
Search
Agenda - 11-03-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 11-03-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 3:33:04 PM
Creation date
9/26/2016 4:09:20 PM
Metadata
Fields
Template:
BOCC
Date
11/3/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
679, <br /> measure in lake level. The lowest dwelling foundation <br /> adjacent to the lake is 18 inches above the predicted lake <br /> level during the once in 50 year storm event. During the <br /> 100 year and larger storm events, the flashboard system. <br /> could be collapsed to increase available spillway capacity <br /> and protect the structures from flooding. An automatic <br /> level monitoring system would be provided to alert County <br /> officials of impending high lake levels. The additional <br /> cost for the alarm system and collapseable feature in the <br /> flashboard system would be approximately 10-15 thousand <br /> dollars. <br /> 2 . Cost of improvements, if undertaken, would be approxi- <br /> mately the same whether for a one or two foot increase. <br /> 3. Opinion among the lakefront property owners appears to be <br /> divided on what to do with the lake level. <br /> IMPACT: A response to Hillsborough and the property owner would allow <br /> each to know how the county intends to proceed. <br /> ALTERNATIVES: <br /> 1. Proceed with engineering design to raise the lake by 1 <br /> foot; or <br /> 2. Poll the residents to determine their views on raising the <br /> lake 2 feet an authorize engineering design to go to 2 <br /> feet contingent upon obtaining clear title. (Hoard <br /> guidance on the questionnaire would be gathered prior to <br /> action if this alternative is selected) . <br /> ....................................... <br />
The URL can be used to link to this page
Your browser does not support the video tag.