Browse
Search
Agenda - 11-03-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 11-03-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 3:33:04 PM
Creation date
9/26/2016 4:09:20 PM
Metadata
Fields
Template:
BOCC
Date
11/3/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VOTE UNANIMOUS. 7 <br /> 6. CREE% ;. . !E SUBDIVI- OA c R LIMIN;L; Y PLAN <br /> Marvin Collins <br /> Prelmirnar Presented, for consideration of approval a <br /> y plan for Creek Side Subdivision. The property is located on <br /> Harmony Church Road (SR #1341) in Cheeks Township. Two lots are proposed <br /> out of 12.92 acres. The property is zoned Agricultural Residential and <br /> designated Agricultural Residential in the Land Use Plan. The Planning <br /> Board recommended approval of the Preliminary Plan with the condition that <br /> a revised Preliminary Plan be submitted showing setbacks and required <br /> landscaping. <br /> Motion was made by Commissioner Walker, seconded by Commissioner <br /> Lloyd to approve the Planning Board recommendation. <br /> VOTE: UNANIMOUS. <br /> 7 . -OAK EST' ES PHASE 4 - _ IMINARY PLAN <br /> Marvin <br /> plan presented for' consideration of approval <br /> a <br /> ruin oval <br /> preliminary lan for the Mel-Oak Estates Phase 4 Subdivision. The <br /> property is located in Chapel Hill Township. Six lots are proposed, each <br /> approximately 40,000 square feet. The property is located in the Rural <br /> Buffer which presently requires a two acre minimum lot size. The <br /> developer elo <br /> been is requesting approval of the six-lot design since Mel-Oaks has <br /> an on-going subdivision. The 6.3 acre tract is zoned R-1 and located <br /> in <br /> the University t <br /> y e i - h Planning ratmhas <br /> recommended of the proposed sx1otsubdivision because they felt phase 4 was a c ontinuation of a previous subdivision and to require two acre <br /> an inconsistency within that development. <br /> Collins made reference to the policy adopted b. the s at this time would <br /> October 3 that <br /> any phased develo "��ent that on <br /> by e Board <br /> alter the a suggested planned. <br /> Board p su hatehadhbeenhe planned <br /> Planning Board <br /> would insure consistency within those acre lot size. <br /> saes to be completed eted under the old standard of one <br /> This <br /> recommended approval y hose developments. The. Planning with the attachment of four conditions. g <br /> After ensued discussion, it was decided that the policy would be <br /> revised to include those phased developments which have received in <br /> part <br /> preliminary plan approval - that are phased and at least one phase has <br /> received preliminary plat approval and where the sketch plan has been. <br /> approved for the entire project. A revised policy will be presented at <br /> the November 18 meeting. This item was postponed until November 18. <br /> p. HOB STEAD HILLS: P _=._ ' II PREL l a NARY <br /> Marvin Collins presented for consideration of approval the <br /> Preliminary Plan l <br /> for Homestead Hills Subdivision Phase II. The p y <br /> ise located inChapel Hill Township on the north side of Homestead property Road (SR <br /> 1777) . The tract is bordered by residential develop lent and proposed <br /> recreational property owned by Orange County. Eleven lots are <br /> out of 12.23 acres. The zoning property of the p y R-1 the LandoUse <br /> Plan designation is Suburban Residential. ThePlanning Boardrecommended <br /> approval <br /> of the Preliminary Plan contingent upon the following conditions: <br /> (1) I, dicate that this is "Phase II" of Homestead Hills <br /> Subdivision. <br /> (2) Revise plans to provide radius (224 ' ) in second curve as <br /> recommended by NCDOT. <br /> (3) Provid-, dedication of additional five (5) feet of right-of-way <br /> from Lot 1. Carrboro recoil ' ended 20 feet to dedicate half of <br /> a 100-foot right-of-way. The. Chapel Hill-Carrboro <br /> Thoroughfare Plan designated Homestead Road as a minor <br /> thoroughfare (collector street) . Orange County requires a 70- <br /> foot right-of-way for collector streets or five (5) additional <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.