Orange County NC Website
APPLICATION. FOR EROSION CONTROL PLAN APPROVAL ANTI GRADING PERMIT i� . <br /> ORANGE COUNTY EROSION CONTROL ORDINANCE - • �. <br /> SEDIMENTATION AND - EROSION CONTROL DIVISION <br /> ORANGE • COUNTY PLANNING DEPARTMENT . <br /> 106 EAST MARGARET LANE • <br /> HILLSBOROUGH, N.C. 27278 - - . <br /> .. NAME OF PROJECT: Carol.tna Paving - Turner . V - <br /> 2. LOCATION OF PROJECT: 11434te 2 Box. 556 Durk, N. C. 27702 •TOWNSHIP:* En° - .. .TAX MAP:. �5 . BLOCK; . ' . LOT: 77 - <br /> JURISDICTIONAL AREA: '... -r- V <br /> 3. SIZE OF TRACT:. 15.6- AC.; AMOUNT OF DISTURBANCE: 544.5 SQ J1 <br /> 4. • TYPE -OF- CONSTRUCTION: clearing 4 grading <br /> ' 5. PLANS PREPARED By: __Cease Eng_ineer t_ Ca. Inc. <br /> - ' ' ADDRESS: Duraarn, N.C. ' <br /> V <br /> . . .. .. . .PHONE,:'6$272oi <br /> . CONTACT: Sidney Czedle V <br /> 6. PERSON OR FIRM RESPONSIBLE FOR IMPLEMENTING THE EROSION CONTROL PLAN: <br /> NAME: Allen E. Turner• • . Durham, N.C. - - <br /> ADDR -ADDRESS: PHONE: 3856 <br /> CONTACT:. ' . <br /> . .: . ' , OFFICE USE ONLY <br /> 7.' FEES: - ' - V • ' <br /> PLAN REVIEW: $ .r937•5.° DATE PAID .RECEIPT # ___________ <br /> GRADING PERMIT: $ i675.oa . DATE PAID _ RECEIPT #• <br /> TOTAL: $ 2812.So . DATE PAID S'`$s`�S6 RECEIPT 3?3 <br /> S, APPLICATION AND PERMIT REQUIREMENTS PLEASE READ CAREFULLY ! II <br /> THIS APPLICATION IS SUBMITTED AND ACCEPTED SUBJECT TO THE 'FOLLOWING <br /> CONDITIONS: V -•• <br /> • THE INFORMATION PROVIDED ON THIS FORM IS, TO THE BEST OF H' KNOWLEDGE <br /> V ACCURATE AND COMPLETE. . . <br /> PERSONNEL FROM. THE EROSION- CONTROL DIVISION SHALL VISIT -THE SITE IN <br /> V- <br /> ORDER . TODETERMINE .IF -THE ROSION CONTROL-PLAN IS ACCEPTABLE. AND TO . <br /> INSPECT•THE..SITE FOR COMPLIANCE ONCE A GRADI NG'PERMIT IS ISSUED. <br /> ALL EROSION. CONTROL DEVICES SHOWN ON THE APPROVED -PLAN. OR--DESCRIBED <br /> IN THE PLAN NARRATIVE- AND ANY MODIFICATIONS TO THE PLAN REQUIRED BY THE <br /> EROSION CONTROL OFFICER -SHALL BE-INSTALLED AT THE APPROPRIATE TIME IN - <br /> THE CONSTRUCTION- SEQUENCE -AND MAINTAINED ACCORDING TO THE APPROVED PLAIN' <br /> - UPON COMPLETION .OF CONSTRUCTION, TOE- SITE SHALL BE STABILIZED IN A <br /> PERMANENT MANNER AS DESCRIBED IN THE. ROSION CONTROL PLAN. <br /> • <br /> - CONTINUED ON BACK <br />