Orange County NC Website
that some stream flow studies had been done but he <br /> was referring to a complete study. of the watershed . <br /> Jacobs asked if one of the concerns of the study <br /> would be a new reservoir site. Cox responded -that <br /> the detailed engineering study for a reservoir or <br /> dam design would not be part of the study but that a <br /> site with the optimum yield could be found. Jacobs <br /> inquired about the study performed by John McAdams <br /> Company. Cox responded that the study by McAdams <br /> was Just a compilation of existing data and not a <br /> new study . <br /> MOTION: Shanklin moved to recommend to the Board of Commis- <br /> sioners that a Capacity Use Study on the Eno River <br /> be done. Seconded by Walters. <br /> Planning Director Collins recommended that the <br /> Planning Board get more information from John Wray <br /> before sending a resolution forward to the Board of <br /> Commissioners. <br /> It was the consensus of the Board to acquire more <br /> background infornation on the study by asking John <br /> Wray to meet with the Planning Board at the regular <br /> meeting in November before sending forward a <br /> resolution supporting a study. <br /> The motion was withdrawn . <br />