Browse
Search
Agenda - 10-06-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 10-06-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 3:21:59 PM
Creation date
9/26/2016 2:49:37 PM
Metadata
Fields
Template:
BOCC
Date
10/6/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE 0 8 Distribution to: <br /> ORDER OWNER 1..1 . <br /> ARCHITECT El • <br /> AMA DOCUMENT 6701 CONTRACTOR Et <br /> FIELD ❑ <br /> • OTHER ❑ <br /> PROJECT: Carr Building Renovation CHANGE ORDER NUMBER: 1 . <br /> (name, address) Corbin St. <br /> Hillsborough, NC INITIATION DATE: 9_29-86 <br /> . TO (Contractor): <br /> `- ARCHITECT'S PROJECT NC): 5568 <br /> D.W. .Ward Construction Co. I CONTRACT FOR: General Construction • <br /> P.O. Box 15157 <br /> Durham, NC 27704 <br /> L J CONTRACT DATE:August 13, 1986 <br /> You ar(•directed to make the following changes in this Contract: <br /> Item One <br /> Reduce thickness of metal roof to 26 gauge Credit $7,995.00 <br /> Item Two <br /> Remove section of terrazzo floor topping Extra 334.00 <br /> Resultant Change Order Amount Credit $7,661.00 <br /> \ut r.rlid unlit sigrwd by hall, du.(Miler and Ar(hitect. <br /> tir);n.ourr'II Ihr• ( IInt I'M I,u' indicalvs hi' agreement herewith, in,hiding any adiusenvnl in the Contract Sum or (•ontr,nI lino•. <br /> The original (Contract Sum) (,fi(kail(c%,fl/Ar'tt( r4/0/1.1411/was $ $221,856.00 <br /> Net change by previously authorized Change Orders $ _0_ <br /> The (C=ontract Sum) (/C/U.l�rir/additliVa 1414/�vi, >AI(prior to this Change Order was / $ 221,856. <br /> The (Choir..( Sum)A(fvi,/rtitiLld,I�,� �iUdr/i/(/c/sr!)/will be /i/irlrLrt il/ (decreased)/�y{r/(/(■Mir/r <br /> by this Change Order $ 7,661. <br /> The new (Contract Sums/(/ yF/1)(I A1j1.y4(1(i/1/t/ryffrn including Ibis Change Order will he $ 214,195. • <br /> The Contract Time will be r I 1/ic h/e/i/9FY (unchanged) by ( -0- ) Days. <br /> The Date of Substantial Completion as of the date of this Change Order therefore is February 27, 1987 . • <br /> Authorized: <br /> CHR Associates, PA D.W. Ward Construction Co. County of Orange <br /> � I I ( I (OV A(:IR OWNER <br /> Airport Road lOub Co rrrn inic-a-inn Dri . 106 F_ MarefgrPt Lane <br /> \rkhe...• Address Address <br /> . Chapel Hill, NC 27514 Durham, NC 27704 Hillsborough, NC 27278 <br /> It1•..-- _ InY — —.�. _ By __---_____ __.. <br /> DAIL I)AIi • <br /> AIA UOCUMCNT 6711l (I1:\N(;( I)1(I)I I AI'F:II I'I;It 11)111(IN • AI.\'" 1478 <br /> II11 AMI KluAN Iv,1IIult.Or AR(Iulrurs, 174■ NI.\V VI)RI; Ayr-, `.\\•-.tv.•01IIN(,I()ti, DA-. 200111' C701 ---1978 <br />
The URL can be used to link to this page
Your browser does not support the video tag.