Orange County NC Website
• 02 I <br /> - _APPLICATION FOR EROSION CONTROL PLAN APPROVAL AND GRADING PERMIT <br /> ORANGE COUNTY EROSION CONTROL ORDINANCE - <br /> SEDIMENTATION AND EROSION CONTROL DIVISION <br /> ORANGE COUNTY PLANNING DEPARTMENT <br /> 106 EAST MARGARET LANE <br /> HILLSBOROUGH, N.C. 27278 - <br /> 1. NAME OF PROJECT:. Carolina Paving — Turner <br /> 2, LOCATION OF PROJECT:.=Ioate 2 Box 556 Durham, N. C. 27702 <br /> TOWNSHIP: Eno 1AK MAP: 25 BLOCK: LOT: 77 <br /> JURISDICTIONAL AREA: Orngp nemn±y - <br /> 3. SIZE OF TRACT: X5'6± _AC,; AMOUNT OF Di DISTURBANCE: 544.500 SQ.FT. <br /> 4. TYPE OF CONSTRUCTION• clearing & grading . <br /> 5. PLANS PREPARED By: Credle Engineering Co. Inc. <br /> ADDRESS: _ , N.C. . - <br /> .PHONE:"682 2006 - , <br /> . CONTACT: _Sidney Credle _- . <br /> 6, PERSON OR FIRM RESPONSIBLE FOR IMPLEMENTING THE EROSION CONTROL PLAN: <br /> NAME: Allen E. Turner - <br /> Durham, N.C. <br /> A PHONE: 38A856 6 <br /> ADDRESS: • P <br /> CONTACT:• <br /> • OFFICE USE ONLY . <br /> 7. FEES: - <br /> PLAN REVIEW: $ .937'50 DATE PAID RECEIPT L <br /> GRADING PERMIT: $ 187S.00 DATE PAID . RECEIPT 133 , <br /> TOTAL: $ 2812.50 DATE PAID s '6 RECEIPT i 93 <br /> S. -- APPLICATION AND PERMIT REQUIREMENTS PLEASE READ CAREFULLY ! ! E - <br /> THIS APPLICATION IS SUBMITTED AND ACCEPTED SUBJECT TO THE -FOLLOWING <br /> CONDITIONS: - _ <br /> • THE INFORMATION PROVIDED ON THIS FORM IS, TO THE BEST OF MY KNOWLEDGE, <br /> ACCURATE AND COMPLETE . <br /> PERSONNEL FROM THE EROSION-CONTROL DIVISION SHALL VISIT -THE SITE IN <br /> ORDER TO -DETERMINE IF THE EROSION. CONTROL.PLAN IS ACCEPTABLE. AND TO <br /> INSPECT THE .SITE FOR COMPLIANCE ONCE A GRADING PERMIT IS ISSUED. <br /> • ALL EROSION, CONTROL DEVICES SHOWN ON THE APPROVED -PLAN- OR- DESCRIBED <br /> IN THE PLAN NARRATIVE AND ANY MODIFICATIONS TO THE PLAN REQUIRED BY THE <br /> EROSION CONTROL OFFICER - SHALL BE- •INSTALLED AT THE APPROPRIATE TIME IN <br /> THE CONSTRUCTION SEQUENCE AND MAINTAINED ACCORDING TO THE APPROVED PLAN'. <br /> • UPON COMPLETION OF CONSTRUCTION, THE, SITE SHALL BE STABILIZED IN A <br /> PERMANENT MANNER AS DESCRIBED IN THE EROSION CONTROL PLAN. <br /> CONTINUED ON BACK <br /> w <br />