Browse
Search
Agenda - 10-06-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 10-06-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 3:21:59 PM
Creation date
9/26/2016 2:49:37 PM
Metadata
Fields
Template:
BOCC
Date
10/6/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- CHANGE Distribution to <br /> ORDER OWNER <br /> ARCHlll-.CT g] OCT 23 <br /> Ain lxO(:UMENT G701 CONTRACTOR [2. • 1 <br /> FIELD ❑ <br /> OTHER ❑ <br /> ',,W. N1,41iD I✓UNS) CO. iNC. <br /> PROTECT: Carr Building Renovation CHANGE ORDER NUMBER: 1 - <br /> (name. address► Corbin St. <br /> Hillsborough, NC INITIATION DATE: 9-29-86 <br /> TO (Contractor): <br /> ARCHITECTS PROJECT NO: 5568 <br /> D.W. .Ward Construction Co. CONTRACT EC?R- <br /> - <br /> P.O. Box 15157 General Construction <br /> Durham, NC 27704 <br /> J CONTRACT DATE:AuguSt 13, 1986 <br /> You aro'directed to make the following changes in this Contract: <br /> Item One <br /> Reduce thickness of metal roof to 26 gauge Credit $7,995.00 <br /> • <br /> Item Two <br /> Remove section of terrazzo floor topping Extra 334.00 <br /> Resultant Change Order Amount Credit $7,661.00 <br /> \,i1%maid until..itiru•tl h)'both•Iht•(htnrr mill Art hilt.t t. <br /> till;n,ti r' ui II (•rutIr,u lur .rgrt•t•nu•nI Itt•rt•teilh• int hiding any adlustinvnl in the contract Sum ar corium 1 t <br /> I'hl' original (Contract Sum) ttk,(1/du((/rdliA111k kUitAitiwas .. $ $221,856.00 <br /> Net change by previously authorized Change Orders $ _0_ <br /> The (Contract Sum) (d(uJirAtc/df 1W1iiiduid Lida prior to this Change Order was $ 221,856. <br /> the IC:untracl Sum)tdnUrlitilJJ/ t/iu{r/i/dds/l/wiII be/i>S(Wr4A Wt/(decreased/Atit{J tikidi <br /> by this (:hinge Order $ 7,661. <br /> The new (Contract Sum)i((�l�yFy(1i(1 !")(i/`i/)/c/'Y•//Ilti including this Change Order will he -.- $ 214,195. • <br /> The Contract Time will he 000/4,144¢1/fcAihie, yk1(.(unchanged) by ( –0_ ) Days <br /> The Date of Substantial Completion as of the date of Ihi; Change Order therefore is February 27, 1987 <br /> AuthOrize(l: <br /> CHR Associates, PA D.W. Ward Construction Co. .County of Orange <br /> .'/ Ia,I r port Road ( b AC (M <br /> om�n eati on tL_ O VNtR <br /> 106 <br /> F._ filar rPt i anP <br /> Chapel Hill, NC 2 514 Durham, NC 27704 Hill borough NC 27278 <br /> c?' Q� gtr .._.. <br /> I):�IL 'C�- L?� _ I)Arl/ 2 9 DATE - - <br /> AIA UUCUMLNT G7111 • (IIAN(a: (MRIIII: • AI'KII 1,1:11 (1)1111 IN • AI,r •••i•);t1 <br /> 1111 Val"(WAN IN%1111111.111101 AK(I 11 l l t 1%, 1711 NI W l0R .\\'I'.,`.w..�1'1A111NU tt).\•MU. _111$11. G701 -197 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.