Orange County NC Website
A. Phase 1 <br /> Phase 1 of the study shall be as described in <br /> Article I of this Agreement . Phase 1 will include <br /> preparation of a preliminary report describing the <br /> evaluations made during the course of the study and <br /> recommending the most appropriate alternative for <br /> meeting the long-term water supply needs of Orange <br /> County . Monthly meetings with the Water Supply <br /> Advisory Committee are included during this phase . <br /> B . Phase 2 <br /> Phase 2 of the study will not be undertaken until <br /> authorized by the OWNER . The purpose of this portion <br /> of the study will be to develop more detailed <br /> engineering and cost information for the recommended <br /> alterative . Specific tasks to be performed shall be as <br /> described in Article I of this Agreement . <br /> ARTICLE III - SCHEDULE <br /> The work to be performed and the services to be rendered <br /> under each part of this Agreement shall commence as directed by <br /> the OWNER . The study described under Article II , Part A shall be <br /> completed within approximately six ( 6 ) months following <br /> authorization to proceed by the OWNER . The additional <br /> engineering evaluations described in Article II , Part B will be <br /> completed in approximately three ( 3 ) months following <br /> authorization to proceed by the OWNER. <br /> Page 6 of 11 <br />