Orange County NC Website
a . Preliminary construction layouts will be prepared <br /> for the purposes of establishing the nature and <br /> quantity of work required . <br /> b . Estimates of land area needs and relocations will <br /> be developed to the extent possible based on <br /> available information . <br /> c. Preliminary estimates of spillway requirements <br /> will be developed based on current North Carolina <br /> regulations , if applicable . <br /> d . Preliminary cost estimates will be developed for <br /> construction , including land acquisition and <br /> estimated annual operation and maintenance <br /> expenses . <br /> e. A preliminary assessment of expected environmental <br /> and socioeconomic impacts will be made . <br /> 6. Alternate means of financing the recommended project <br /> will be considered , including creation of special tax <br /> districts and alternate bond financing . Preliminary <br /> estimates of user fees will be prepared for project <br /> benefactors . <br /> 7 . A preliminary report will be prepared covering all of <br /> the aspects of the feasibility study . The report <br /> discussion will include consideration of available <br /> methods for financing, steps and procedures involved in <br /> implementing the recommended construction program . <br /> This report will be submitted to the County <br /> Page 4 of 11 <br />