Orange County NC Website
APPLICATION FOR EROSION CONTROL PLAN APPROVAL -AND GRADING kiliIT _ <br /> - ORANGE COUNTY EROSION CONTROL ORDINANCE -. <br /> SEDIMENTATION AND - EROSION CONTROL DIVISION - . <br /> ORANGE . 000NTY PLANNING DEPARTMENT <br /> 106 EAST MARGARET LANE _ <br /> HILLSBOROUGH, N.C. . 27278 - - <br /> 1. NAME OF PROJECT: Carolina Paving - Turner _ - <br /> 2. LOCATION' OF PROJECT: 5to11te 2 Box-556 Durham, N. C. 2?702 <br /> TOWNSHIP:. Ent) fAX MAP: . 25 BLOCK: LOT: 77 - - <br /> . ,JURISDICTIONAL AREA: Orr 0-vircp, nm . ` - . <br /> 3, . SIZE OF TRACT:. 15'6± 4 <br /> AC.; AMOUNT OF DISTURBANCE: 59500 - SO IFT. <br /> 4. . TYPE •OF. CONSTRUCTION: clearing & grading . <br /> 5. PLANS PREPARED By: Credle Engineering Co. Inc. - <br /> ADDRESS: Durham; N.C. <br /> PHONE:-682 2006 - <br /> . CONTACT: Sidney Credle . • ' -- <br /> 6. PERSON OR FIRM RESPONSIBLE FOR IMPLEMENTING THE EROSION CONTROL PLAN: <br /> : NAME: Allen E. Turner _ <br /> Durham, N.C. . . - . <br /> ADDRESS: D HONE• 33- 856 <br /> CONTACT:- <br /> - - OFFICE USE ONLY <br /> 7. FEEs: : - <br /> PLAN REVIEW: $ 937.50 DATE PAID RECEIPT # <br /> GRADING PERMIT: $ ia75.Oa DATE PAID - - RECEIPT # _ . <br /> TOTAL: $ 2812.50 DATE PAID S—g-'$6 RECEIPT I X393 <br /> 8.: APPLICATION AND PERMIT REQUIREMENTS PLEASE READ CAREFULLY ! ! ! - ' <br /> THIS APPLICATION IS SUBMITTED AND ACCEPTED SUBJECT TO THE .-FOLLOWING <br /> • CONDITIONS: - - <br /> - - THE INFORMATION PROVIDED ON THIS FORM 1S, TO THE BEST OF MY KNOWLEDGE. <br /> ACCURATE AND COMPLETE . <br /> • PERSONNEL- FROM- THE EROSION-CONTROL DIVISION SHALL VISIT -THE SITE IN <br /> ORDER • TO-.DETERMI NE IF -THE tROSIOM CONTROL.PLAN IS ACCEPTABLE. AND TO <br /> INSPECT THE..SITE .FOR COMPLIANCE ONCE A GRADING PERMIT IS ISSUED. <br /> . ALL EROSION- CONTROL DEVICES SHOWN ON THE APPROVED -PLAN. OR--DESCRIBED <br /> IN THE PLAN NARRATIVE- AND ANY MODIFICATIONS TO THE- PLAN REQUIRED BY -THE <br /> EROSION CONTROL OFFICER •SHALL BE-INSTALLED AT THE APPROPRIATE TIME IN <br /> THE CONSTRUCTION SEQUENCE -AND MAINTAINED ACCORDING TO THE APPROVED PLANT. <br /> - UPON COMPLETION--OF CONSTRUCTION, THE, SITE SHALL BE STABILIZED IN A <br /> PERMANENT MANNER AS DESCRIBED IN THE' EROSION CONTROL PLAN. <br /> CONTINUED ON BACK <br />