Browse
Search
Agenda - 09-16-1986
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1986
>
Agenda - 09-16-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 11:46:27 AM
Creation date
9/26/2016 1:46:17 PM
Metadata
Fields
Template:
BOCC
Date
9/16/1986
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> northern Orange County in terms of some of the stream losses below Lake <br /> Orange before it gets to Corporation Lake. During extreme drought <br /> periods a significant percent of the water is lost from evaporation and <br /> transpiration and other means from Lake Orange to Corporation Lake. He <br /> noted that the OWASA operating scheme is not set forth in detail in terms <br /> of how they operate their system when pumping is done from Cane Creek and <br /> the quarry. Based on the model done by the Division of Water Resources <br /> the yield from the OWASA system during the critical drought of records is <br /> 6.2mgd. It means that both north and south Orange County without system <br /> modifications or outside water import would have problems in a very <br /> severe drought. In terms of comparison, without modifications to the <br /> northern Orange or a drawdown system with the percentage of time above <br /> 30% storage, the Eno system would be about 93% in October and 82% in <br /> December. He further explained that 82% of the time it would be greater <br /> than 30% full and 18% of the time less than 30% full. This does not <br /> include the steam loss. The OWASA system would be 94% for October and <br /> 88% for December on a 30% basis. With the modifications in the Eno <br /> system the percentage would increase to 99% for October and 96% for <br /> December. Because OWASA can bring in 2mgd from Durham, the stress would <br /> be in the northern end of the County without any water supplement. <br /> He mentioned that all ordinances should be reviewed and modified with <br /> serious consideration given to the optimization of the OWASA system in <br /> terms of fine tuning their operation and determining how best yields <br /> could be operated from that system. To date, this has not been done but <br /> should be as soon as possible. There are some problems experienced on <br /> the Eno River downstream which need to be resolved. In summation Mr. <br /> Wray asked that consideration be given to balancing the increased growth <br /> with the increased yield so that the systems can be improved. There is <br /> the need for a consensus to resolve a number of things and in particular <br /> in the northern part of the County in terms of water resources. <br /> Commissioner Marshall asked about the stage one triggering level of <br /> 90% and John Wray indicated that this triggering point is addressed in <br /> the revised table that will be voted upon later in the meeting. He will <br /> continue to work with the County Administrators especially in terms of <br /> operating the system. <br /> Commissioner Lloyd asked Wray to explain his statement about problems <br /> in the northern end of the County. Wray explained the problem had to do <br /> with the stream gauge showing the water at a lower level than the <br /> Ordinance recommended. His office had received several letters of <br /> complaint about the situation. Based on past experience and studies, he <br /> would suspect some damage to aquatic life during this period. <br /> Commissioner Lloyd asked Wray to comment on the possibility of not <br /> using Lake Orange as the sole triggering point for enacting the various <br /> stages of the Water Ordinance. Wray indicated there had been times, <br /> particularly before Lake Ben Johnston and Corporation Lake were drawn <br /> down, where a spilling took place and where the rules could have been <br /> relaxed. However, as soon as the spilling stopped, the optimum water <br /> yield would be that it would have to go back to that specified in the <br /> Ordinance. <br /> Commissioner Lloyd explained the spillage that took place at both <br /> Lake Ben Johnston and Corporation Lake in August. John Wray noted that <br /> the average flow is 4mgd. <br /> In answer to a question from Chair Willhoit Wray explained that any <br /> system has downstream and upstream users. Some release would provide for <br /> some utilization for upstream and downstream users. <br /> G. WATER RELATED MATTERS <br /> 4 . WATER SUPPLY STATUS AND ORDINANCE REVISIONS <br /> Chair Willhoit explained that the proposed revisions to the Water <br />
The URL can be used to link to this page
Your browser does not support the video tag.